How much output the workstation fleet produced
How many machine-hours were recorded
How efficiently production time was converted into output
How much planned capacity had operator coverage
How much staffed capacity remained idle
Which workstations are overloaded
Which workstations are losing the most capacity
How much rework was processed
Whether workstation availability, quality, or performance is reducing effectiveness
How much work is waiting for each workstation
Whether current capacity can support the queued workload
Day, Week, Month, and Custom reporting periods
History and Live productivity information
Workstation search and filters
Current workstation statuses
Fleet-level productivity KPIs
Constraint and waste insights
Individual workstation drill-downs
1.
Scheduling information, including planned and staffed capacity
2.
Recorded production progress, including duration, output, workstation, stage, labour, and rework
Down hours mean the workstation was unavailable.
Coverage-gap hours mean the workstation was planned but had no available operator.
Idle hours mean staffed capacity was available but no production time was recorded.
Actual hours mean production activity was recorded against the workstation.
Production continues beyond scheduled capacity
Work is recorded outside the resolved shift
Overtime production occurs
Operator assignments are incomplete
Production timestamps or durations require review
Days without scheduled capacity
Days with operator shortages
Gaps between staffed and actual hours
Production outside expected capacity
Changes after staffing adjustments
Changes after schedule modifications
Live, Degraded, or History indicator
Workstations or By Stage toggle
Workstation-group selector
Previous and next group controls
Historical-shift selector
Low utilization every Monday
Repeated unstaffed shifts
High production on specific weekdays
Missing capacity on selected dates
Periods above 100% utilization
The correct output unit is selected
Item measurements are complete
Stage default durations are realistic
Production durations were entered correctly
The correct workstation and stage were recorded
Record workstation downtime
Create maintenance orders
Complete breakdown orders
Assign preventive-maintenance plans
Record maintenance completion accurately
1.
Select the reporting period.
2.
Select the required output unit.
3.
Apply workstation filters.
4.
Review the Right Now statuses.
6.
Check Where the Hours Went.
7.
Investigate the Most Constrained workstation.
8.
Investigate the Biggest Waste.
9.
Review the workstation ranking.
10.
Review the Capacity Trend.
11.
Check the Utilization Heatmap.
12.
Open individual workstation details.
15.
Confirm maintenance and quality information.
16.
Open the Andon Board for live monitoring.
1.
Monitor Running, Idle, Down, Unstaffed, and Behind-Pace stations.
2.
Investigate workstations with no active job.
3.
Confirm production progress is being recorded.
4.
Review current shift pace.
5.
Respond to breakdowns and operator gaps.
6.
Rebalance work when one station becomes constrained.
1.
Compare Planned, Staffed, and Actual Hours.
4.
Compare output with the expected target.
5.
Review rework and quality.
7.
Record downtime and staffing reasons.
8.
Document corrective actions for the next shift.
Users require the appropriate productivity permission.
Every workstation should be linked to the correct production stage.
Workstation groups should reflect the real factory structure.
Capacity targets should use realistic units and quantities.
Stage default durations should be maintained.
Planned hours should come from current calendars and shifts.
Staffed hours require a present operator.
Downtime should not be recorded as a staffing gap.
Coverage gaps should not be treated as maintenance downtime.
Production must be recorded against the correct workstation.
Output must represent successful physical production without duplication.
Rework must be classified separately from first-pass output.
Revert and refabrication should not erase previously performed effort.
A dash must not be interpreted as zero.
Utilization above 100% should be investigated.
Production with zero staffed hours indicates schedule or data misalignment.
Machine-load interpretation requires realistic stage durations.
Maintenance records should be completed accurately.
Current periods should be treated as in progress.
Workstation Productivity should be used with production context rather than as an isolated performance score.
Use clear and consistent workstation names.
Assign every workstation to a meaningful group.
Keep production-stage mappings accurate.
Configure capacity targets for every reporting unit used by management.
Complete item weight, area, length, volume, and quantity data.
Assign operators before the planned shift begins.
Review coverage gaps before releasing the production schedule.
Keep calendars, shifts, and schedule exceptions current.
Record production activity against the correct workstation and shift.
Investigate repeated idle time instead of treating it as one general loss.
Compare utilization with output, coverage gap, and Machine Load.
Use the Andon Board for live operational monitoring.
Review the Capacity Trend across several periods.
Use the Utilization Heatmap to identify recurring patterns.
Record downtime separately from operator shortages.
Report breakdowns when they occur.
Keep maintenance plans and orders current.
Review rework, rework hours, and first-pass yield together.
Investigate dashes as missing data or configuration.
Use Most Constrained and Biggest Waste to prioritize follow-up.
Review Machine Load before assigning additional work.
Validate standards when efficiency variance appears unrealistic.
Use workstation results for capacity planning, coaching, and process improvement.