  1. Quality Control
  • Getting Started
    • Introductions
    • Installing Fabritec as a Desktop or Mobile App
    • User Profile & Change Language
    • Notification Settings and Push Notifications
    • Home
  • Administration & Setup
    • Company Setup
      • Company Profile
      • Preferences
      • License Info
      • Settings
    • Users & Permissions
      • Roles
      • Departments
      • Users
      • Logs
    • Production Setup
      • Production Stages
      • WorkStations
      • Categories
      • Routes
      • Labour Titles
      • Shifts
      • Labours
      • Labour Group
  • CRM
    • Introduction to CRM
    • Forecast Dashboard
    • CRM Pipeline and Enquiry Management
    • CRM Customers
    • CRM Analytics
    • CRM Settings
  • Projects
    • Customer & Project Basics
      • Customers
      • Create New Project
      • Overview
      • Details
      • Buildings
    • Documents & Communication
      • Folder Structure
      • Documents
      • Messages
    • Phases, Items & Revisions
      • Phases
      • Phases Explorer
      • Phases Explorer: Manual Item Entry, Drawing Validation, and Smart Allocation
      • Revisions: Bulk Paint Update & Selective Item Deletion
    • Routing & Production
      • Routing Setup
      • Tracking
    • Project Quality Control
      • Quality Control
    • Project Shipping
      • Shipping Status
      • Shipping
    • Site Completion
      • Erection
  • Production Execution
    • Production
    • Production Access
    • Production Logs
    • Revert & Refabricate Items in Production
  • Tasks Managment
    • Task Manager
    • Task Templates
    • Task Schedule View
  • Quality Control
    • Inspections
    • Quality Control Access
  • Shipping & Delivery
    • Shipping Yard
    • Shipping Calendar
  • Insights, Reports & AI
    • Dashboards
    • Reports
    • Connecting Fabritec with AI Assistants: Claude AI and ChatGPT
  • Fabritec Workflow
    • Fabritec Project Lifecycle workflow
    • Fabritec Dashboards and Reports workflow
    • Production Setup & User Management Workflow
  1. Quality Control

Inspections

The Inspections tab in Fabritec is the operational workspace used to review and process Quality Control requests submitted from production.
image.png
It provides a centralized view of inspection requests across projects, phases, items, and production stages. Authorized quality users can inspect submitted quantities, record accepted quantities, reject nonconforming work, return quantities for refabrication, attach supporting evidence, and review completed inspection history.
The Inspections tab helps quality, production, and management teams confirm:
What quantity was submitted for inspection
Which item and production stage were inspected
Who submitted the production quantity
When the inspection request was created
How much quantity was accepted
Whether the request was approved, partially approved, or rejected
Whether any quantity was returned for rework or refabrication
Who completed the inspection
When the inspection decision was recorded
Unlike production pages, which focus on performing and recording manufacturing work, the Inspections tab controls the quality decision that determines what happens to quantities waiting for QC.

Where to Find Quality Control Inspections#

Navigate to:
Quality Control → Inspections
The page displays inspection requests from across the factory, subject to the logged-in user’s role permissions, assigned QC stages, and outsourced QC access.

How an Inspection Request Is Created#

An inspection request is normally created when:
1.
A production stage is configured with Requires Inspection.
2.
An item follows a route containing that stage.
3.
A production user records completed quantity against the stage.
4.
Fabritec creates the related production record.
5.
The submitted quantity is moved into the Quality Control workflow.
6.
The item shows the submitted quantity as waiting for inspection.
The production stage configuration determines whether a completed production update requires Quality Control. Stages such as Welding, Bending, Painting, Galvanizing, or Visual Inspection may be configured to require inspection according to the organization’s workflow.
A production update connected to a QC-required stage remains linked to its inspection result. Once Quality Control completes the review, the accepted and rework quantities are reflected in the production record and item progress.

Important#

An item does not appear in the Inspections tab simply because it exists in production.
The item must have:
A valid production route
A stage configured to require inspection
A submitted production quantity
A quantity currently waiting for a QC decision
No workflow condition preventing the inspection request
Visibility under the logged-in user’s permissions

Inspections Page Overview#

The Inspections page contains:
Approve All
Reject All
Refresh
Excel Export
PDF Export
Clear filter
Search
Columns
Reset cache
Column-level filters
Row selection checkboxes
Row-level inspection actions
Pagination controls
Items-per-page selection
The table may contain both:
Inspection requests requiring action
Completed inspection records retained for traceability
Use the Status filter to separate pending work from historical results.

Inspection Table#

Each row represents one Quality Control request linked to a specific item, production stage, and submitted quantity.
ColumnDescription
PhaseThe project phase containing the inspected item
MarkThe item, component, or mark identifier
StageThe production stage being inspected
StatusThe current inspection state
QtyThe total quantity submitted for inspection
Quantity AcceptedThe quantity accepted by Quality Control
Sent byThe Fabritec user who submitted the production update
Sent dateThe date and time when the quantity entered the inspection workflow
Inspected byThe user who completed the QC decision
Inspection dateThe date and time when the inspection response was recorded
ActionsOpens the request for inspection or displays the completed inspection details

Phase#

The Phase column identifies the project phase associated with the inspection request.
For example:
EG-2391-01-01
Use the Phase filter when reviewing:
QC workload for a specific project
Inspection history for one project phase
Repeated failures within a phase
Accepted quantities before shipping
Phase-specific audit records

Mark#

The Mark column identifies the exact production item being inspected.
Examples include:
S6
S9
BA1009
RF3009
C70
The same mark may appear more than once when:
Different quantities were submitted at different times
The item passed through multiple QC-required stages
A quantity was returned for rework and submitted again
Production was completed in separate batches
Always review the Mark together with the Phase, Stage, Sent date, and Qty.

Stage#

The Stage column identifies the manufacturing operation being inspected.
Examples visible in the Inspections table may include:
Bending
Rolling
Welding
Galvanizing
The stage is important because each inspection must be evaluated against the correct process requirements.
For example:
Bending inspection may focus on dimensions, radius, angle, and deformation.
Welding inspection may focus on joint quality, weld profile, defects, and drawing requirements.
Galvanizing inspection may focus on coating condition, coverage, surface defects, and required thickness.
Painting inspection may focus on surface preparation, finish, colour, and coating requirements.
Fabritec records the inspection result. The organization’s inspection criteria should be defined through its approved quality procedures.

Qty#

The Qty column shows the total quantity submitted for the current inspection request.
For example:
MarkQty
S648
S94
C812
This quantity represents the current submitted batch. It does not necessarily represent the item’s complete project quantity.
An item with a total quantity of 100 may be submitted through multiple inspection requests, such as:
First request: 40
Second request: 35
Third request: 25

Quantity Accepted#

The Quantity Accepted column shows how much of the submitted quantity passed the inspection.
Examples:
QtyQuantity AcceptedMeaning
4848The full submitted quantity was accepted
4830Part of the quantity was accepted
120No submitted quantity was accepted
83Three units passed; five units require further action
The accepted quantity is reflected in the related production and item progress. A quantity that is not accepted may require rework, refabrication, or another quality action.

Sent by and Sent Date#

Sent by identifies the Fabritec user who submitted the production operation that created the inspection request.
Sent date identifies when the request entered Quality Control.
These fields support traceability between:
Production submission
Quality review
Inspection outcome
Accepted quantity
Rework activity
The user shown under Sent by is not necessarily the worker who physically performed the operation. A production supervisor may submit a production update on behalf of assigned labour.

Inspected by and Inspection Date#

Inspected by identifies the user who recorded the Quality Control decision.
Inspection date identifies when the decision was submitted.
These fields remain empty while the inspection is still pending.
After the inspection is completed, they provide an audit trail showing:
Who made the decision
When the decision was made
What quantity was accepted
What final status was recorded

Inspection Statuses#

The Status column communicates the current outcome of each request.

Pending#

A Pending request is waiting for a Quality Control decision.
Pending requests normally display:
An orange status
An Edit or inspection-action icon
No inspector
No inspection date
No accepted quantity, or a blank accepted value
Pending records can be selected for individual or bulk action.

Approved#

An Approved status means the submitted quantity was accepted.
In a complete approval:
Quantity Accepted = Qty
Example:
Submitted quantity: 48
Accepted quantity: 48
Status: Approved
The accepted quantity becomes completed for the inspected stage and continues according to the item’s configured route.
Depending on the route, the accepted quantity may:
Become available at the next production stage
Complete the final production stage
Become eligible for the Shipping Yard
Remain subject to another configured workflow requirement
Approval does not always mean that the item is immediately ready for shipping. The result depends on the remaining stages in the route.

Partially Approved#

A Partially Approved status means that only part of the submitted quantity passed inspection.
Example:
Submitted quantity: 48
Accepted quantity: 30
Remaining quantity: 18
Status: Partially Approved
The calculation is:
Remaining Quantity = Submitted Quantity − Accepted Quantity
In this example:
48 − 30 = 18
The accepted quantity can continue through the configured workflow.
The remaining quantity must be handled through the applicable rework, refabrication, rejection, or additional quality procedure.
Fabritec can therefore represent a production result as partially accepted and partially returned for further work.

Rejected#

A Rejected status means that the inspected request was not accepted.
A fully rejected request normally shows:
Quantity Accepted: 0
Status: Rejected
Inspector
Inspection date
Rejected quantity does not continue as accepted production.
The quantity must be handled according to the organization’s rejection procedure, which may include:
Rework
Refabrication
Repair
Replacement
Scrap
Engineering review
Supplier corrective action for outsourced work

Row Actions#

The Actions column changes according to the status of the inspection.

Inspect or Edit Icon#

A Pending request displays an action icon that opens the Inspection Request window.
Use this action to:
Review the request details
Enter the accepted quantity
Add a response
Attach supporting documents
Approve the inspection
Reject the inspection
Send the quantity for refabrication

View Icon#

A completed inspection displays a View icon.
Use it to review the recorded inspection details without treating the request as a new pending action.
The completed record can include:
Mark
Phase
Stage
Inspection status
Submitted quantity
Accepted quantity
Rework quantity
Submitted user
Submission date
Inspector
Inspection date
Response
Attachments

The Inspection Request Window#

Open a Pending inspection from the Actions column.
image.png
The Inspection Request window displays the information required to evaluate the submitted quantity.
The visible information can include:
Mark
Phase
Submitted user
Submission date and time
Current status
Production type or Outsourcing indicator
Total quantity
Rework quantity
Quantity Accepted
Response
Attachments
Refabricate
Reject
Approve

Request Header#

The top section identifies the request.
For example:
Mark: H1
Phase: 120-01-11
Submitted by: Admin
Submitted on: Tuesday, April 21, 2026, 3:37 PM
Status: Pending
Production type: Outsourcing
Review this information before entering the inspection result.
Confirm that you are inspecting:
The correct project phase
The correct mark
The correct production stage
The correct submitted batch
The correct production source

Outsourcing Indicator#

When Outsourcing appears in the request, the inspected work was recorded as outsourced production.
Outsourced inspection requests may require:
Supplier documentation
Delivery records
Material certificates
Coating or testing certificates
External inspection reports
Supplier corrective-action evidence
The user must have the appropriate outsourced QC access to process these requests.
The detailed configuration of this permission is covered in the separate Quality Control Access article.

Total Quantity#

Total shows the quantity included in the current request.
Example:
Total: 2
The accepted quantity must be evaluated against this total.
Do not enter an accepted value greater than the submitted total.

Rework#

The Rework value identifies the quantity associated with an existing rework cycle, when applicable.
Example:
Rework: 0
A value of zero indicates that the displayed request does not currently show an existing rework quantity.
When a reworked quantity is submitted again, review the request history and supporting information to confirm that the original issue has been corrected.

Quantity Accepted#

Quantity Accepted is a required field.
Enter the quantity that passed inspection.
The accepted quantity must normally be:
Zero or greater
Equal to or less than the submitted total
Based on the actual inspected result

Full Acceptance#

For a total quantity of 48:
Quantity Accepted = 48
Then click Approve.
The request becomes Approved.

Partial Acceptance#

For a total quantity of 48, where 30 units pass:
Quantity Accepted = 30
Then complete the remaining quality action according to the workflow.
The result is recorded as Partially Approved when only part of the submitted quantity is accepted.

No Acceptance#

When no units pass:
Quantity Accepted = 0
Use Reject or Refabricate, depending on the required operational outcome.

Response#

The Response field is optional in the interface, but it should be used whenever clarification is required.
A useful quality response should state:
What was inspected
What requirement was not met
Which quantity was affected
The required corrective action
Any relevant drawing, specification, or procedure reference
Example:
18 units rejected due to bending angle outside the approved tolerance. Return to Bending for correction and resubmit for inspection.
Avoid unclear responses such as:
Not good
Failed
Fix it
Recheck
Clear responses reduce repeated questions and strengthen traceability.

Attachments#

Use Attachments to add supporting evidence.
Relevant attachments may include:
Inspection photographs
Measurement records
Checklists
Test results
Welding inspection reports
Coating thickness reports
Supplier certificates
Nonconformance records
Marked-up drawings
Corrective-action evidence
Attachments are especially useful when:
A request is rejected
Only part of a batch is accepted
Outsourced work is being inspected
The issue may affect client reporting
The inspection decision may be audited later

Completing an Individual Inspection#

Approving the Full Quantity#

Use full approval when all submitted units meet the required quality criteria.

Steps#

1.
Navigate to Quality Control → Inspections.
2.
Locate the Pending request.
3.
Click the inspection action icon.
4.
Confirm the Phase, Mark, Stage, and Total.
5.
Enter the full submitted quantity in Quantity Accepted.
6.
Add a Response when required.
7.
Attach supporting evidence when required.
8.
Click Approve.
9.
Confirm that the request status changes to Approved.
10.
Confirm that the inspector and inspection date are recorded.

Partially Approving a Quantity#

Use partial approval when part of the submitted batch passes and part requires further action.

Steps#

1.
Open the Pending inspection.
2.
Review the total submitted quantity.
3.
Enter only the quantity that passed in Quantity Accepted.
4.
Explain the non-accepted quantity in the Response field.
5.
Add photographs, measurements, or other evidence when available.
6.
Select the appropriate action for the remaining quantity.
7.
Confirm that the final result is recorded correctly.

Example#

FieldValue
Submitted Qty48
Quantity Accepted30
Remaining Quantity18
ResultPartially Approved
Suggested response:
30 units accepted. 18 units require refabrication due to dimensional nonconformance.

Rejecting a Request#

Use Reject when the submitted request does not meet the acceptance requirements and should be recorded as rejected.

Steps#

1.
Open the Pending request.
2.
Confirm the item and stage.
3.
Set Quantity Accepted to zero when no quantity passes.
4.
Enter the rejection reason.
5.
Attach evidence when available.
6.
Click Reject.
7.
Confirm that the status changes to Rejected.
A rejection should clearly identify the reason and the expected next action.

Sending Quantity for Refabrication#

Use Refabricate when some or all of the inspected quantity must return to production for manufacturing correction.
Refabrication is appropriate when the item must be manufactured again or significantly corrected rather than accepted in its current condition.
Examples include:
Incorrect dimensions
Incorrect bend geometry
Wrong component configuration
Severe fabrication defects
Material processed against the wrong requirement
A failed outsourced operation requiring replacement or repeat processing

Steps#

1.
Open the Pending inspection.
2.
Confirm the submitted quantity.
3.
Enter the accepted quantity, if any portion passed.
4.
Describe the refabrication reason.
5.
Attach supporting evidence.
6.
Click Refabricate.
7.
Verify the related item and production records.
The quantity returned for rework or refabrication is directed back into the applicable production workflow rather than being counted as accepted. The exact next stage depends on the item route and the organization’s configured process.

Reject and Refabricate Are Not the Same#

Use Reject to record that the inspection request failed the required quality decision.
Use Refabricate when the quantity must be returned to manufacturing for correction or replacement.
Your organization’s SOP should define when each action is used.

Bulk Inspection Actions#

The Inspections tab supports:
Approve All
Reject All
These actions become available after eligible rows are selected.
Use the row checkboxes to select the required Pending requests.

Approve All#

Use Approve All when all selected inspection requests can be accepted in full.
Appropriate examples:
A verified batch of identical items
Multiple marks inspected under the same approved conditions
A group of completed inspection requests with full acceptance
Do not use Approve All when:
Different accepted quantities must be entered
Some requests require partial approval
Different responses are required
Separate evidence must be attached
The items were not physically inspected
The selected requests include different quality outcomes

Reject All#

Use Reject All when all selected requests require a full rejection.
Do not use Reject All when:
Some quantity passed
A partial approval is required
Different rejection reasons apply
Some requests require refabrication instead of rejection
Supporting evidence must be attached individually

Bulk Action Warning#

Bulk QC decisions can affect multiple production records and quantities.
Before clicking Approve All or Reject All:
Review every selected row
Confirm the Phase and Mark
Confirm the Stage
Confirm the submitted Qty
Confirm that only Pending requests are selected
Confirm that one common outcome is correct for all selected records
Use individual inspection actions whenever the selected requests require different accepted quantities, responses, attachments, or rework decisions.

Searching and Filtering Inspections#

Search#

Use the main Search field to locate records using visible inspection information.
Search can help locate:
A phase
A mark
A stage
A submitted user
An inspector
For a more precise review, combine Search with column filters.

Column Filters#

Filter icons are available in supported column headers.
Common filtering scenarios include:

Pending Workload#

Filter:
Status = Pending
Use this view to identify all inspections requiring action.

Approved Inspections#

Filter:
Status = Approved
Use this view for completed-quality reporting.

Partial Approval Review#

Filter:
Status = Partially Approved
Use this view to identify batches where some quantity required rework or further action.

Rejected Inspections#

Filter:
Status = Rejected
Use this view for nonconformance and corrective-action review.

Inspection by Stage#

Filter by Stage to review quality performance for one process.
Examples:
Welding
Bending
Rolling
Galvanizing

Inspection by User#

Filter by:
Sent by
Inspected by
This supports accountability and workload analysis.

Date-Based Review#

Use the Sent date or Inspection date filters when reviewing:
Daily inspection activity
Weekly QC output
Monthly rejection trends
Inspection response time
Audit periods

Clear Filter#

Click Clear filter to remove column-level filters.
This restores the broader table view.
When text remains in the main Search field, clear the search separately.

Page Tools#

Refresh#

Click Refresh to retrieve recent inspection requests and updated results while keeping the current page context.
Use Refresh after:
A production quantity is submitted to QC
Another inspector completes a request
A rework quantity is resubmitted
An inspection result has just been recorded
A new outsourced request is expected

Reset Cache#

Click Reset cache when the table still displays older information after Refresh.
Use Reset cache when:
A recent request is not visible
A completed inspection still appears Pending
The accepted quantity is not updated
An inspector or inspection date is missing
A rework result is not reflected
The table appears inconsistent with the related item details
Reset cache reloads the displayed information. It does not delete inspection records.

Columns#

Click Columns to show or hide table columns.
This allows each user to focus on the information relevant to the current review.
Example views:

QC Inspector View#

Phase
Mark
Stage
Status
Qty
Quantity Accepted
Sent date
Actions

QC Manager View#

Phase
Mark
Stage
Status
Qty
Quantity Accepted
Sent by
Inspected by
Inspection date

Audit View#

Enable all available columns.
Hiding a column changes only the current display. It does not remove the underlying inspection data.

Excel Export#

Click Excel Export to download the inspection table in spreadsheet format.
Use Excel exports for:
Monthly quality reporting
Rejection analysis
Partial-approval analysis
Inspector workload reviews
Phase-specific QC reports
Corrective-action tracking
Internal audit preparation
Apply the required filters before exporting when a focused dataset is needed.

PDF Export#

Click PDF Export to create a formatted inspection report.
PDF exports are useful for:
Formal management reviews
Client progress documentation
Quality audit evidence
Period-based inspection summaries
Project handover files

Pagination#

Inspection histories can contain hundreds or thousands of records.
Use the controls at the bottom of the page to:
Move to the next or previous page
Jump between page numbers
Move to the first or last available page
Change the number of items displayed per page
Review the total number of pages
Review the total number of records
Apply filters before browsing large inspection histories.

How Quality Control Affects Production#

Quality Control is directly connected to item-stage progress.
A typical workflow is:
1.
Production records a quantity.
2.
The stage requires inspection.
3.
The quantity becomes under inspection.
4.
Quality Control reviews the request.
5.
Accepted quantity becomes completed at the stage.
6.
Accepted quantity continues through the route.
7.
Rework or refabrication quantity returns to the applicable workflow.
8.
Production Logs and Item Details display the inspection outcome.
This connection preserves traceability between:
What production submitted
What Quality Control inspected
What passed
What failed
What was returned for correction
Who made the decision
When the decision was made
Fabritec’s production records can represent quantities as waiting for inspection, accepted, returned for rework, or partially accepted and partially returned.

Complete Inspection Examples#

Example 1: Full Approval#

A production user submits:
FieldValue
PhaseEG-2391-01-01
MarkS6
StageBending
Qty48
Sent bymanar.saeed
The inspector confirms that all units meet the approved requirements.
The inspector enters:
FieldValue
Quantity Accepted48
ResponseAll units accepted
ActionApprove
Final result:
FieldResult
StatusApproved
Qty48
Quantity Accepted48
Rework0
All 48 units continue according to the production route.

Example 2: Partial Approval#

A production user submits:
FieldValue
PhasePM-876-01-34
MarkS6
StageBending
Qty48
The inspector finds that 30 units are acceptable and 18 require correction.
The inspector enters:
FieldValue
Quantity Accepted30
Response18 units outside bending tolerance
ActionRefabricate remaining quantity
Final result:
FieldResult
StatusPartially Approved
Qty48
Quantity Accepted30
Remaining18
Thirty units continue through the route.
Eighteen units return for the applicable corrective workflow.

Example 3: Full Rejection#

A production user submits:
FieldValue
Phase120-01-11
MarkC8
StageRolling
Qty12
The full batch fails inspection.
The inspector enters:
FieldValue
Quantity Accepted0
ResponseRolling diameter outside approved tolerance
ActionReject
Final result:
FieldResult
StatusRejected
Qty12
Quantity Accepted0
The rejected quantity does not continue as accepted production.

Common Issues and Troubleshooting#

A Production Item Does Not Appear in Inspections#

Confirm that:
The production update was saved successfully
The stage is configured with Requires Inspection
The correct item route is assigned
The submitted quantity is greater than zero
The quantity has not already been inspected
The user has access to the relevant QC stage
Outsourced access is enabled when required
No Search value is hiding the record
No column filter is hiding the record
Then:
1.
Click Refresh.
2.
Click Clear filter.
3.
Clear the Search field.
4.
Click Reset cache if required.

The Inspection Action Icon Is Not Available#

Confirm that:
The request is still Pending
The user has the required Quality Control role permission
The user is assigned to inspect the production stage
The request is not restricted as outsourced work
Another user has not already completed the inspection
Completed requests normally display a View icon instead of an inspection-action icon.

Approve All and Reject All Are Disabled#

These buttons normally require eligible rows to be selected.
Confirm that:
One or more Pending rows are selected
The selected records are eligible for the action
The user has permission to complete inspections
Completed Approved or Rejected records are not being treated as pending requests

Quantity Accepted Cannot Be Saved#

Confirm that the entered quantity:
Is numeric
Is not negative
Does not exceed the submitted total
Reflects the actual inspected quantity
Also confirm that the required action was selected.

The Inspection Still Appears Pending#

Confirm that:
Approve, Reject, or Refabricate was completed successfully
The page displayed a success confirmation
The network connection remained active
The inspection was not opened in another session
Then click:
Refresh
Reset cache, if the result remains unchanged

The Accepted Quantity Is Lower Than Qty#

This normally means that only part of the submitted batch passed inspection.
Review:
Status
Quantity Accepted
Response
Rework quantity
Attachments
The related Production Log
The item’s stage-level progress
A lower accepted quantity is expected for a Partially Approved result.

An Approved Quantity Did Not Move to the Next Stage#

Confirm that:
The item has a valid route
A next stage exists
Required previous operations are complete
No other inspection is pending
The phase or item is released
No hold or workflow restriction exists
The approved quantity is reflected in Item Details
Approval completes the quality requirement for the inspected quantity. Progression still depends on the configured production route.

An Outsourced Request Is Not Visible#

Confirm that:
The production stage is configured as outsourced
The inspection request was created successfully
The logged-in user has outsourced QC access
The stage is included in the user’s Quality Control access
Filters are not hiding the request

An Attachment Is Missing#

Confirm that:
The file upload completed before the decision was submitted
The file type and size are accepted by the system
The correct request is being reviewed
The completed inspection is opened through the View icon

Best Practices#

Review Pending inspections at the start and end of each shift.
Confirm the Phase, Mark, Stage, and Qty before recording any decision.
Enter only the quantity that physically passed inspection.
Do not approve a full batch when only part was inspected.
Use partial approval when only part of the submitted quantity passes.
Record clear rejection and refabrication reasons.
Attach evidence for rejected, partially approved, outsourced, or disputed work.
Use bulk actions only when one decision correctly applies to every selected request.
Review repeated rework by stage, workstation, mark, and supplier.
Use Inspection date and Sent date to monitor QC response time.
Apply filters before exporting large inspection histories.
Use Reset cache only when Refresh does not display recent changes.
Review the related production record when inspection quantities appear inconsistent.
Keep QC stage access aligned with inspector qualifications and responsibilities.
Follow the organization’s approved inspection and nonconformance procedures.

🔗 Related Articles#

Production – Items are completed here before going to QC
Shipping Yard – Only QC-approved items appear for yard entry
Reports – Analyze QC performance, productivity, and backlog