Workstation shifts without an operator
Missing calendar configuration
Maintenance-related capacity loss
Labour and Crew schedules
Actual hours above or below staffed capacity
Operators assigned, linked, or derived from production-stage eligibility
Capacity Board and Timeline views
Workstations, Workstation Groups, Labour, and Crews tabs
Day, Week, and Month periods
Which shift applies to this labour on Monday?
Is this workstation planned to operate?
Does the workstation have an available operator?
How many planned hours are staffed?
How much capacity was lost to maintenance?
How many production hours were recorded?
Which operator source is staffing the workstation?
Which shifts still require an operator?
Is the date non-working or not configured?
How much capacity is available in the Cutting Area?
Which group has the largest operator gap?
How much production was recorded across the group?
Which group is most affected by maintenance?
Is the group fully staffed for the selected week?
Only one of several planned shifts has an operator
An operator is absent or on leave
A workstation is staffed for part of the day
Some capacity was removed by maintenance
Eligible operators are assigned elsewhere
No operator is linked to the workstation
No eligible production-stage labour is available
All eligible operators are assigned elsewhere
The linked operator is absent or on leave
The worker’s resolved shift does not match
No daily assignment was created
Work recorded outside staffed time
Overlapping production records
Long or incorrect production durations
Missing schedule or attendance configuration
Work recorded against a date with limited staffed capacity
1.
Open the Workstations tab.
2.
Select the required workstation and date.
3.
Open the applicable shift details.
5.
Choose an eligible labour.
6.
Review any existing assignment warning.
Labour shifts are configured
Workstation operator links are configured
Production-stage eligibility is configured
Absence and leave exceptions are recorded
Manual assignments are reviewed
The worker’s resolved shift
Workstation operator links
Production-stage eligibility
Absence and Leave exceptions
Previous operator continuity
Existing weekly assignment balance
Workstation demand priority
Workstation operator links
Production-stage labour eligibility
Work Calendar compatibility
Absence and Leave exceptions
Existing assignments elsewhere
All shifts are already covered
No eligible operators exist
Eligible operators are absent
Operators are assigned elsewhere
Labour shifts do not match
The selected days are Approved or Locked
Workstation schedules are not configured
The resource’s effective Work Calendar
Whether the Holiday applies to that calendar
Special Working exceptions
Date and recurring-year settings
Cached scheduling information
Shift Calendar values are calculated from source scheduling and production data.
Planned Hours come from effective Work Calendars and Work Shifts.
Shift breaks are excluded from planned working hours.
Maintenance downtime is reported separately from operator gaps.
Coverage Gap is available planned time without staffing coverage.
Actual Hours come from Production records.
Utilization is Actual Hours divided by Staffed Hours.
Utilization may exceed 100%.
A daily assignment takes priority over Linked and Derived coverage.
Linked operators take priority over Derived operators.
A worker must be present on the matching shift to provide coverage.
Absent and Leave workers do not satisfy workstation coverage.
One labour cannot be explicitly assigned to different workstations for the same date and shift.
Passive Linked or Derived coverage uses one operator for only one workstation per shift.
Manual assignment may create a one-day Swap Cover when shifts differ.
Auto-fill never creates Swap Cover exceptions.
Auto-fill does not move Manual assignments.
Re-running Auto-fill fills only remaining gaps.
Clear Auto-fill removes only automatic assignments.
Approved and Locked days reject operator assignment changes.
Non-Working dates do not create operator coverage gaps.
Missing schedule configuration is shown as Not Configured.
Overnight shifts belong to the date on which they start.
Workstation Group values are aggregated from member workstations.
Period Utilization is calculated from period totals rather than averaging daily percentages.
Capacity Status is different from the live Running, Idle, or Down workstation status.
Configure Shifts and Work Calendars before using the Shift Calendar
Resolve Not Configured resources before reviewing staffing gaps
Link normal operators directly to their workstations
Use Production Stage eligibility as a fallback rather than the main long-term plan
Record Absence and Leave before running Auto-fill
Prepare weekly assignments before the production week begins
Run Auto-fill again after correcting missing links or exceptions
Review every unresolved Auto-fill result
Use Manual assignment only when a specific operational decision is required
Review Swap Cover consequences before confirming an assignment
Avoid assigning one worker to multiple machines in the same shift
Use Workstation Groups to compare production-area capacity
Review the Timeline for night shifts and overlaps
Investigate utilization above 100% instead of assuming it is incorrect
Correct Production source records when Actual Hours are wrong
Keep Maintenance orders and downtime windows accurate
Review Holidays and Special Working dates before capacity planning
Clear only automatic assignments when rebuilding a plan
Complete scheduling corrections before Timesheet approval
Use Capacity Status filters to focus daily supervisor action
Review Period Summary values rather than relying only on individual days