Related article: For working with documents inside an individual project, see Project Documents in the Projects articles.
| Tab | Purpose |
|---|---|
| Files | Browse folders, upload normal files, create controlled documents, manage permissions, and inspect versions and activity. |
| Required | Find documents awaiting their first upload or a corrected version after review. |
| My reviews | Find documents whose active review step is assigned to you. |
| Workflow | Create and maintain reusable sequences of document review steps. |
| Naming | Define reusable filename patterns and apply them to folders. |
| Folder Structure | Prepare reusable folder layouts and settings for new projects. |
| Permission or access requirement | What it controls |
|---|---|
| View Files | Access to the Documents workspace. This is required even for folders marked Visible to everyone. |
| Upload Files | Creation of top-level general folders in Documents. It does not independently grant controlled-document version upload rights. |
| Manage Documents and Workflows | Workflow template management, controlled-document creation and configuration, and folder workflow settings. Applicable folder permissions are also required. |
| Upload Document Versions | First and replacement uploads for controlled documents, including submission hours. Folder upload permission is also required. |
| Manage Naming Conventions | Creation, editing, cloning, and deletion of naming conventions. |
| View / Manage Folder Structure Templates | Viewing or administering project folder templates. |
| Active-step reviewer assignment | Permission to approve or reject the document at its current review step. Management access alone does not authorize another user's review. |
| Column | Description |
|---|---|
| Name | File, document, or folder name. Icons identify folders, documents, locks, and system-managed items. |
| Version | The current uploaded version, where applicable. |
| Size | File size, where available. |
| Last Modified Date | The displayed modification date. The creation date is used when no modification date is recorded. |
| Status | Folder identification or the controlled document's current state. Normal files do not have review status. |
| Item Actions | The three-dot menu containing actions available for that item. |
| Filter | What it shows |
|---|---|
| All | Accessible items in the current folder, including its immediate subfolders. |
| Approved | Controlled documents whose review workflow is complete. |
| In review | Controlled documents with an active review step. |
| Changes requested | Controlled documents whose current review step was rejected and that need a replacement upload. |
Selecting all items in an ordinary folder listing does not recursively select every descendant. Actions on a selected folder may still include its contents, as explained below.
\ / : * ? " < > |, control characters, or leading/trailing spaces or dots. Some names and root locations are reserved for system use. Duplicate ordinary folder names receive a suffix.| Action | Purpose |
|---|---|
| Open folder | Browse its contents. |
| Permissions | Manage visibility and user or department access. |
| Assign workflow | Set the workflow for future controlled documents and optional default reviewers. |
| Assign naming convention | Apply a filename pattern to the folder. |
| New subfolder | Create a folder beneath it. |
| Details | Inspect the folder's location, settings, and access information. |
| Copy / Cut | Prepare eligible content for copying or moving. |
| Rename folder | Change an ordinary folder's name. |
| Delete folder | Delete an eligible ordinary folder and its contents after confirmation. |
| Level | Access provided |
|---|---|
| Folder Control | View, download, upload, edit, and administer the folder, including permissions and eligible folder deletion. Additional system permissions and protection rules still apply. |
| View, Download, Upload & Edit | View, download, upload, and edit eligible content; create and rename ordinary subfolders; copy or move eligible content. Does not grant folder administration. |
| View, Download & Upload | Browse, download, and upload without edit or folder-administration rights. |
| Upload & Download | Upload and download, with visibility of the folder and its file information. No edit or folder-administration rights. |
| Upload Only | Browse the folder and file information and upload content. Download and file preview are not granted. |
| View Only | View and download accessible content, including supported previews. Uploading, editing, and administration are not granted. |
View Only includes downloading. The Upload Only level does not hide the folder listing; it restricts the available operations.
.exe, .dll, .bat, .cmd, .ps1, .sh, .msi, .scr, .com, .vbs, and .js. File and folder names must also satisfy storage-name and path-length rules.Report.pdf receives a name such as Report (1).pdf.A ZIP download is a file handoff, not a full Fabritec backup. It does not include the complete document version history, deleted files, or workflow records.
Warning: Ordinary-folder deletion permanently removes eligible nested content and recorded versions. Recovery requires a backup. Read the confirmation carefully; this is different from deleting one normal file.
| Field | What to enter |
|---|---|
| Name | The required document name, following the folder's naming convention where applicable. |
| Estimated hours | A nonnegative estimate. The default is 0, meaning no estimate is needed. |
| Start date | An optional planned start date. |
| Due date | An optional due date. When both dates are entered, the due date cannot be earlier than the start date. |
| Responsible user | The required person responsible for supplying the file. |
| Workflow / step reviewers | The workflow resolved from the folder and at least one reviewer for every step. Folder defaults prefill these selections when configured. |
Conversion is one-way. The file becomes a controlled document and is no longer eligible for normal-file copy, move, or delete actions.
Enter only hours not already recorded in the task. Upload hours are added to existing preparation logs; they do not replace them.
An Approved document with a completed workflow cannot be reopened by uploading another version or applying another workflow. Completion is terminal for that controlled document.
Status names are configurable. Labels such as To Do, In Progress, or their Arabic equivalents are display names; the configured order determines pending work, progress, and completion.
Workflow-template edits can affect active documents. Folder-structure-template edits, described below, do not synchronize into existing projects. These are different behaviors.
_), Hyphen (-), or Dot (.) as the delimiter.| Attribute type | Configuration and behavior |
|---|---|
| Constant text | Enter a fixed value that must match that part of the filename. |
| Auto text | No fixed value is configured. This part accepts the corresponding text already present in the filename without asking for a separate upload value. It is not an automatic sequence number. |
| Date | Select a date format. That filename part must contain a valid date matching the format; it is not required to equal the upload date. |
DWG, Auto text, and a Date part formatted YYYYMMDD.DWG-A101-20260920.pdfA101 for you; it accepts the text in that position.Applying a convention does not automatically rename noncompliant existing files. Correct the listed names and apply it again.
A folder structure is copied during project creation. Later changes to the structure do not automatically change existing projects.
| Document stage | Linked task behavior |
|---|---|
| Awaiting first upload | An Upload task is created immediately and assigned to the responsible uploader. |
| Active review | The same task is assigned to the active step's reviewers and uses that step's configured status. |
| Changes requested | The task returns to the responsible uploader and the first configured task status. |
| Replacement submitted | The same task returns to Step 1's reviewers and status. |
| Approved | The task uses the final status, records completion, and clears its assignees. |
| Event | Who is notified |
|---|---|
| Document created awaiting upload | The responsible uploader. |
| Uploader changed while an upload is outstanding | The newly responsible uploader. |
| First/new version uploaded, conversion completed, or next step activated | The current step's reviewers. |
| Reviewers added to the active step | The newly added reviewers. |
| Intermediate approval, requested changes, or final approval | The responsible uploader, latest version uploader, and document creator, excluding the person performing the outcome action. |