Fabritec Docs
English
  • English
  • Arabic
Learning Center
Support CenterChangelog
Learning Center
Support CenterChangelog
English
  • English
  • Arabic
English
  • English
  • Arabic
  1. Projects
  • Introductions
  • Fabritec Production Setup & User Management
    • Production Setup
      • Production Stages
      • WorkStations
      • Categories
      • Routes
      • Labour Titles
      • Shifts
      • Labours
      • Labour Group
    • User Management
      • Roles
      • Departments
      • Users
    • Settings
      • Company Profile
      • Preferences
  • General
    • Home
    • Dashboards
    • Reports
    • User Profile & Change Language
    • Projects
      • Create New Project
      • Details
      • Buildings
      • Documents
      • Messages
      • Phases
      • Phases Explorer
      • Revisions: Bulk Paint Update & Selective Item Deletion
      • Routing Setup
      • Tracking
      • Quality Control
      • Shipping Status
      • Shipping
  • Menu
    • Folder Structure
    • Task Manager
    • Production Page
    • Revert & Refabricate Items in Production
    • Quality Control
    • Shipping Yard
    • Shipping Calendar
  • Fabritec Workflow
    • Fabritec Project Lifecycle workflow
    • Fabritec Dashboards and Reports workflow
    • Production Setup & User Management Workflow
Learning Center
Support CenterChangelog
Learning Center
Support CenterChangelog
English
  • English
  • Arabic
English
  • English
  • Arabic
  1. Projects

Phases Explorer

The Phases Explorer is one of the most important modules inside any project in Fabritec.
It acts as the central workspace where all engineering and production data for a phase is prepared, reviewed, validated, and approved before moving downstream.
Using Phases Explorer, you can:
Manage phase revisions
Upload and organize items, drawings, and files
Generate and download Bill of Materials (BOM) reports
Review, validate, and approve revisions with full traceability
Control what data is released to Routing, Production, QC, and Shipping
This workspace ensures accuracy, traceability, and controlled decision-making between engineering, planning, production, and quality teams.
Phases Explorer Overview

šŸ“ Where to Find Phases Explorer#

Navigate to:
Projects → Select Project → Phases Explorer
At the top of the page, you will find:
Project Selector
Phase Selector
āš ļø Always confirm that the correct project and phase are selected before creating or editing revisions.

šŸ“‚ Tabs Inside Phases Explorer#

Phases Explorer is divided into three main tabs:

šŸ” Revisions#

Displays all revisions created for the selected phase.

āœ… Final Items#

Shows only the latest approved items released to production.

🧩 Sub Items#

Displays detailed breakdowns for assemblies or built-up items.

šŸ” Revisions Tab#

The Revisions tab is the starting point for creating, reviewing, and managing revisions.

Information Displayed#

Phase Name
Revision Number
Status (Add Items, Completed, Under Review, Approved)
Created By / Reviewed By / Approved By
Approval Date

Available Actions#

āœļø Edit Revision
šŸ—‘ļø Delete Revision
šŸ‘ļø View Revision Details

Export Options#

Excel Export
PDF Export
BOM Report
Revisions Tab

āž• Creating a New Revision#

Click Add Revision.
Add Revision

Step 1: Select Phase#

Choose the phase you want to create a revision for, then click Next.

šŸ”„ Revision Workflow#

Each revision follows four structured steps:

1ļøāƒ£ Add Items#

Upload or manually add production items.

Import from Excel / CSV#

Select a schema matching your file format
Upload the file
Review detected items before saving

Create a Custom Schema#

If your file format differs:
Click Add New Schema
Define column mappings (Item Mark, Quantity, Profile, Material, etc.)
Save the schema for reuse
Add Items

Item Classification After Import#

New
Updated
Deleted
Exports available:
Excel
PDF

2ļøāƒ£ Add Drawings#

Link each item to its corresponding drawing.
Add Drawings

Drawing Statuses#

No Matching Found → Drawing not uploaded or not matched
Matched → Drawing successfully linked

Available Actions#

Link / Unlink drawing
Delete drawing reference
Click Upload Drawings when finished.

3ļøāƒ£ Add Files#

Organize all supporting documents within the revision folder.
Default structure:
REV00/
└── Drawings/
You can:
Upload PDF files
Upload DWG / DXF files
Add additional folders
Manage files like a document management system

4ļøāƒ£ Review & Confirm Revision#

Before submitting the revision for approval, review:
Items
Drawings
Files
Total quantities
Total weight
If everything is correct, click Confirm Revision.
Confirm Revision

āœ… Revision Approval Workflow#

Once a revision is confirmed, its status becomes Under Review.
āš ļø Important Note
Approval Validation and View Changes do not appear in Revision 0.
They become available starting from Revision 1, once comparison with a previous revision is possible.
Approval Workflow

Step 1: Approval Validation#

Performs a full pre-check against the current production state and detects:
Items deleted after production has started
Items modified while already in production or completed
Conflicts between revision data and production status
Results:
āŒ Errors → Approval blocked with clear reasons
āœ… No errors → Safe to approve

Step 2: View Changes#

Shows a full comparison between current and previous revisions:
Items added
Items updated
Items deleted
Detailed before / after values
Ensures full visibility before approval.

Step 3: Accept or Reject#

Accept → Revision becomes final
Reject → Sent back for correction
Accept or Reject
Once accepted:
Items move to Final Items
Revision becomes locked
Data is released to Routing, Production, QC, and Shipping

šŸ“„ Revision Details Page#

Includes:

Revision Info#

Revision number
Created by
Reviewed by
Dates
Description

Final Items Info#

Total number of items
Total weight

Items#

Complete list of approved items.

Documents#

All drawings and files associated with the revision.

šŸ“‘ Bill of Materials (BOM) Report#

Available directly from Phases Explorer.
Includes:
Project information
Phase information
Item list (mark, profile, material, paint, length, weight)
Totals (quantity and weight)
Generated automatically as a clean, printable PDF.

⭐ Best Practices#

Finalize Project → Buildings → Phases before creating revisions
Use Excel Import for large item lists
Create schemas once and reuse them
Upload drawings before linking
Always validate and review changes before approval
Keep revision descriptions meaningful
Use BOM reports for coordination with procurement, planning, and production

šŸ”— Related Pages#

Phases – Configure phase details before revisions
Routing Setup – Define operation sequences
Production – Track manufacturing progress
Quality Control – Inspect approved items
Documents – Manage project-level files

Modified atĀ 2026-02-25 13:48:44
Previous
Phases
Next
Revisions: Bulk Paint Update & Selective Item Deletion
Built with