Fabritec Docs
English
  • English
  • Arabic
Learning Center
Support CenterChangelog
Learning Center
Support CenterChangelog
English
  • English
  • Arabic
English
  • English
  • Arabic
  1. Tasks Managment
  • Getting Started
    • Introductions
    • Installing Fabritec as a Desktop or Mobile App
    • User Profile & Change Language
    • Notification Settings and Push Notifications
    • Home
  • Administration & Setup
    • Company Setup
      • Company Profile
      • Preferences
      • License Info
      • Settings
    • Users & Permissions
      • Roles
      • Departments
      • Users
      • Logs
    • Production Setup
      • Production Stages
      • WorkStations
      • Categories
      • Routes
      • Labour Titles
      • Shifts
      • Labours
      • Labour Group
  • CRM
    • Introduction to CRM
    • Forecast Dashboard
    • CRM Pipeline and Enquiry Management
    • CRM Customers
    • CRM Analytics
    • CRM Settings
  • Projects
    • Customer & Project Basics
      • Customers
      • Create New Project
      • Overview
      • Details
      • Buildings
    • Documents & Communication
      • Folder Structure
      • Documents
      • Messages
    • Phases, Items & Revisions
      • Phases
      • Phases Explorer
      • Phases Explorer: Manual Item Entry, Drawing Validation, and Smart Allocation
      • Revisions: Bulk Paint Update & Selective Item Deletion
    • Routing & Production
      • Routing Setup
      • Tracking
    • Project Quality Control
      • Quality Control
    • Project Shipping
      • Shipping Status
      • Shipping
    • Site Completion
      • Erection
  • Production Execution
    • Production
    • Production Access
    • Production Logs
    • Revert & Refabricate Items in Production
  • Tasks Managment
    • Task Manager
    • Task Templates
    • Task Schedule View
  • Quality Control
    • Inspections
    • Quality Control Access
  • Shipping & Delivery
    • Shipping Yard
    • Shipping Calendar
  • Insights, Reports & AI
    • Dashboards
    • Reports
    • Connecting Fabritec with AI Assistants: Claude AI and ChatGPT
  • Fabritec Workflow
    • Fabritec Project Lifecycle workflow
    • Fabritec Dashboards and Reports workflow
    • Production Setup & User Management Workflow
  1. Tasks Managment

Task Templates

The Task Templates feature inside Fabritec Task Manager allows teams to create reusable task workflows for activities that are repeated across multiple Projects, Buildings, or Phases.
image.png
Instead of recreating the same tasks manually each time, users can define a standard workflow once and apply it whenever the same operational process is required.
Using Task Templates, you can:
Create reusable task workflows
Apply templates to Projects, Buildings, or Phases
Create parent tasks and subtasks
Define assignees and watchers
Add tags and priorities
Configure start offsets and durations
Estimate the work hours required for each task
Create dependencies between related tasks
Calculate dates using calendar days or working days
Preview generated task dates before applying a template
Standardize repeated operational processes
Task Templates help teams reduce manual setup, improve consistency, clarify responsibility, and ensure that important execution steps are not missed.

Where to Find Task Templates#

Navigate to:
Task Manager → Task Templates
The Task Templates page displays the reusable templates available to your organization.
From this page, authorized users can:
Search for templates
Filter available templates
Create a new template
Edit an existing template
Review template details
Apply a template to a Project, Building, or Phase

What Are Task Templates?#

Task Templates are predefined task structures that generate live tasks automatically inside Fabritec.
Each template can contain:
Main tasks
Subtasks
Assignees
Watchers
Tags
Priority
Start Offset
Duration
Estimated Hours
Dependencies
Calendar-day or working-day scheduling logic
In simple terms:
A Task Template is a ready-made execution plan that can be applied to a Project, Building, or Phase.
For example, a Phase Revision Workflow template can include:
Create Revision
Import Phase Items
Upload Phase Drawings
Review Imported Items
Approve Revision
Release Phase for Production
When the template is applied, Fabritec creates these tasks automatically and links them to the selected Phase.

Why Task Templates Are Useful#

Many operational activities follow the same steps across different projects.
Examples include:
New project kickoff
Project document collection
Engineering review
Building preparation
Phase revision preparation
Production release
Quality Control follow-up
Procurement follow-up
Shipping readiness
Site coordination
Without Task Templates, users may need to create the same tasks manually each time.
This can cause:
Missed activities
Inconsistent task names
Missing assignees
Unclear responsibility
Incorrect dates
Repeated administrative work
Different workflows between projects
Delays before execution begins
Task Templates solve this by creating a controlled and repeatable task structure.

Task Templates Page#

The Task Templates page displays available templates as cards.
image.png
Each Template Card may display:
Template name
Description
Tags
Number of tasks
Offset unit
Applies to
Assignee or participant initials
Edit button
Apply button
The information shown on the card helps users understand the template before opening or applying it.
For example, a card may show that the template:
Contains 10 tasks
Uses Working Days
Applies to Projects
Includes Engineering and Planning tags
Assigns tasks to three users

Template Filters#

Users can filter the template library using options such as:
All templates
Created by me
Recently used
These filters help users find the relevant template without reviewing the full library.

Search#

Use the search field to find a template by name.
Examples:
New Project
Upload Documents
Building Preparation
Phase Revision
Production Release
Shipping Readiness
Use clear and specific template names so users can find the correct workflow quickly.

Creating a New Task Template#

To create a new template:
1.
Navigate to Task Manager → Task Templates
2.
Click New Template
3.
Enter the Template Name
4.
Add a Description
5.
Select Applies to
6.
Select the Offset Unit
7.
Add tasks and subtasks
8.
Configure assignees, watchers, tags, and priorities
9.
Define Start Offsets and Durations
10.
Add Estimated Hours where required
11.
Configure dependencies between related tasks
12.
Review the template in Grid View or Timeline View
13.
Click Save

New Template Page#

image.png
The New Template page is where the reusable task workflow is designed.
The page includes:
Template Name
Description
Template Summary
Applies to
Offset Unit
View selector
Task Set
Save button
Cancel button
The Template Summary may display:
Number of tasks
Total template span
Number of assigned people
This gives users a quick overview of the workflow before saving it.

Template Name#

The Template Name is the name displayed in the Task Templates library.
Use a clear name that explains the purpose of the workflow.
Recommended examples:
New Project Kickoff
Project Engineering Workflow
Project Document Collection
Building Preparation Workflow
Phase Revision Workflow
Production Release Checklist
Quality Inspection Follow-Up
Shipping Readiness Workflow
Avoid unclear names such as:
Test
Template 1
Tasks
New Template
Workflow
A clear name helps users select the correct template and reduces the risk of applying the wrong process.

Description#

The Description explains when and why the template should be used.
A good description should clarify:
The operational situation
The expected workflow
The entity to which it should be applied
The intended result
Example:
Use this template when starting a new project to assign kickoff activities, collect project documents, prepare drawings, assign the project team, and begin the initial planning workflow.
Another example:
Use this template when preparing a new Phase revision. It includes item import, drawing upload, quantity review, approval, and production release activities.
Descriptions are especially important when the organization has several templates with similar names.

Applies To#

The Applies to field defines the operational entity that will receive the generated tasks.
Available options include:
Project
Building
Phase
image.png
This setting determines what the user must select when applying the template.

Project#

Select Project when the template contains activities related to the full project.
Project templates can be used for:
Reviewing the contract
Uploading project documents
Assigning the project team
Reviewing the Scope of Work
Preparing the project schedule
Preparing general arrangement drawings
Planning procurement activities
Coordinating project-wide approvals
Example template:
New Project Kickoff
Possible tasks:
Review Contract
Upload Project Documents
Assign Project Team
Confirm Scope of Work
Prepare Initial Schedule
Prepare GA Drawings

Building#

Select Building when the workflow must be repeated for a specific Building inside a Project.
Building templates can be used for:
Reviewing the building model
Extracting the building BOM
Confirming building quantities
Preparing the building phase plan
Reviewing the shipping sequence
Confirming delivery requirements
Preparing building-specific documents
Example template:
Building Preparation Workflow
Possible tasks:
Review Building Model
Confirm Building Information
Extract Building BOM
Prepare Phase Breakdown
Review Shipping Sequence
Confirm Site Requirements

Phase#

Select Phase when the workflow applies to a specific project Phase.
Phase templates can be used for:
Creating a revision
Importing items
Uploading drawings
Reviewing imported data
Approving the revision
Releasing the Phase for production
Following up Quality Control
Preparing packing lists
Confirming shipping readiness
Example template:
Phase Revision Workflow
Possible tasks:
Create Revision
Import Phase Items
Upload Phase Drawings
Review Imported Items
Approve Revision
Release Phase for Production

Offset Unit#

The Offset Unit defines how Fabritec calculates the generated task dates.
image.png
Available options include:
Calendar Days
Working Days
The selected Offset Unit applies to the Start Offset, Duration, and generated task schedule.

Calendar Days#

Calendar Days count every day continuously.
image.png
This includes:
Working days
Weekends
Non-working days
Example:
Template Start Date: June 20
Task Start Offset: 2
Generated Start Date: June 22
Calendar Days can be used for:
Client deadlines
Fixed calendar commitments
General follow-up activities
External review periods
Calendar-based approval windows

Working Days#

Working Days count only the organization’s configured working days.
Non-working days are excluded from the date calculation.
Working Days are normally more appropriate for internal operational workflows such as:
Engineering
Planning
Procurement
Production preparation
Quality Control
Shipping preparation
Internal approvals
Example:
If a template starts on the last working day of the week and the next day is not a company working day, the following task will be scheduled on the next available working day.
Working Days help create a more realistic execution schedule.

Template Views#

Inside the New Template or Edit Template page, users can switch between:
Grid View
Timeline View
Both views display the same template structure but support different review activities.

Grid View#

image.png
Grid View displays the template tasks in a table.
Use Grid View to manage:
Task names
Assignees
Watchers
Tags
Start Offsets
Durations
Priorities
Task order
Subtasks
Grid View is normally the most efficient view for creating or editing the task structure.

Timeline View#

Timeline View displays template tasks visually across a planned timeline.
image.png
The Template Timeline is calculated using:
Start Offset
Duration
Task hierarchy
Subtask timing
Use Timeline View to review:
Task sequence
Task duration
Task overlap
Subtask timing
Overall template span
Assignee distribution
Timeline View helps identify scheduling problems before the template is saved or applied.
For example, it may reveal that:
Two tasks overlap unexpectedly
A task begins too early
A task has an unrealistic duration
A dependent task is scheduled before its predecessor
The complete workflow takes longer than expected

Task Set#

The Task Set is the main section where the template workflow is created.
From the Task Set, users can:
Add tasks
Create subtasks
Reorder tasks
Define assignees
Add watchers
Add tags
Set priorities
Configure Start Offsets
Configure Durations
Open detailed task settings
Add dependencies
The Task Set determines exactly what Fabritec will generate when the template is applied.

Adding a Task#

Click Add Task to create a new task row.
Each task can include:
Task Name
Assignees
Watchers
Tags
Start Offset
Duration
Priority
Use action-based task names that clearly describe the required work.
Recommended examples:
Review Contract
Upload Project Documents
Prepare GA Drawings
Extract Material Takeoff
Create Purchase Request
Import Phase Items
Upload Phase Drawings
Review BOM
Release Phase for Production
Prepare Packing List
Avoid task names that do not explain the required action, such as:
Contract
Documents
Drawings
Review
Production

Subtasks#

Fabritec supports creating Subtasks inside a Task Template.
Subtasks divide a larger activity into smaller and more manageable steps.

Example: Upload Project Documents#

Parent Task#

Upload Project Documents

Subtasks#

Upload Contract
Upload Drawings
Upload BOQ
Upload Technical Specifications
Upload Customer Correspondence

Example: Prepare Phase Revision#

Parent Task#

Prepare Phase Revision

Subtasks#

Create Revision
Import Items
Upload Drawings
Upload Supporting Files
Review Quantities
Confirm Revision Data
Subtasks are useful when:
Several activities contribute to one main result
Different users are responsible for parts of the same work package
Progress needs to be tracked in more detail
A checklist is too simple for the required workflow

Assignees#

Assignees are the users responsible for performing the generated task.
Examples:
TaskSuggested Assignee
Prepare GA DrawingsDesign Engineer
Extract Material TakeoffPlanning Engineer
Create Purchase RequestProcurement Engineer
Release Phase for ProductionProduction Manager
Inspect Final WeldingQC Inspector
Prepare Packing ListShipping Coordinator
Assign tasks to the role or user who is accountable for completing the activity.
Avoid assigning every task to the same user unless that user is genuinely responsible for the complete workflow.

Watchers#

Watchers are users who need visibility into the task but are not responsible for completing it.
Watchers can monitor:
Status changes
Comments
Attachments
Progress
Completion
Delays
Examples of watchers include:
Project Manager
Planning Manager
QC Manager
Shipping Manager
Department Manager
Operations Manager
For example:
The Design Engineer may be the Assignee for Prepare GA Drawings
The Project Manager may be added as a Watcher
This keeps responsibility clear while maintaining management visibility.

Tags#

Tags classify tasks and support easier filtering.
Examples:
Engineering
Planning
Procurement
Production
QC
Shipping
Erection
Client Approval
Internal Review
Documents
Tags should describe the task category or operational area.
Do not use tags as substitutes for task statuses.
For example:
Use the tag Engineering to classify the task
Use the task status to show whether it is To Do, In Progress, or Done

Start Offset#

The Start Offset defines when a task should begin relative to the selected Template Start Date.
It is not a fixed calendar date.
Example:
Template Start Date: June 20
TaskStart OffsetGenerated Start Date
Review Contract0June 20
Upload Documents1June 21
Prepare Drawings2June 22
Because Start Offset is relative, the same template can be reused with different Start Dates.

Understanding Start Offset#

A Start Offset of:
0 means the task starts on the Template Start Date
1 means the task starts one offset unit later
2 means the task starts two offset units later
The actual generated date depends on whether the template uses:
Calendar Days
Working Days

Duration#

The Duration defines how long the task is expected to remain active.
Example:
Task: Prepare GA Drawings
Start Offset: 1
Duration: 5
This means:
Prepare GA Drawings begins one day after the Template Start Date and continues for five days.
Duration helps Fabritec calculate the generated task Due Date.
Use realistic durations based on:
The task scope
Available resources
Approval requirements
Historical execution time
Operational complexity
Avoid giving every task the same duration unless the activities genuinely require the same amount of time.

Priority#

The Priority field defines the urgency and operational importance of the generated task.
Available priority levels may include:
Very Low
Low
Normal
High
Critical
Recommended usage:
PriorityRecommended Usage
CriticalThe task blocks execution or directly affects delivery
HighThe task has significant operational impact
NormalStandard operational activity
LowNon-urgent follow-up
Very LowOptional or long-term improvement activity
Use Critical priority carefully.
If too many tasks are marked as Critical, users will not be able to distinguish the work that genuinely requires immediate attention.

Task Details Inside a Template#

Opening a task inside the template displays the Task Details window.
image.png
The Task Details window may include:
Title
Description
Assignees
Watchers
Tags
Priority
Start Offset
Duration
Estimated Hours
Dependencies
Use this window when the task requires more information than can be configured directly from the Grid View.

Task Description#

The Description field stores detailed instructions for the task.
Use the Description to define:
Scope
Required documents
Review instructions
Acceptance criteria
Internal notes
Production requirements
Quality requirements
Expected output
Example:
Review all Phase 01 drawings and confirm that the latest approved revision is available before importing items into the Phase revision.
Another example:
Confirm that all completed items have passed the required Quality Control inspections before preparing the packing list.
A clear description reduces dependency on verbal explanations after the template is applied.

Estimated Hours#

The Estimated Hours field defines the expected work effort required to complete the task.
Example:
Task: Prepare GA Drawings
Estimated Hours: 16
Estimated Hours can help teams:
Estimate workload
Understand expected effort
Compare planned effort with actual work logs
Improve future planning
Support resource and capacity discussions
Identify tasks with unrealistic schedules
Estimated Hours and Duration represent different concepts.
Duration defines the calendar or working-day span
Estimated Hours defines the expected effort
For example, a task may have:
Duration: 3 working days
Estimated Hours: 8 hours
This means the team expects eight hours of work to be completed within a three-day period.

Dependencies in Task Templates#

Task Templates support Dependencies between tasks.
image.png
A dependency connects one task to another in a planned sequence.
Dependencies help teams avoid starting or completing work before the required predecessor activity is ready.
Examples:
Drawing Review must finish before Production Release starts
Material Estimation must finish before Purchase Request preparation starts
Final Inspection must finish before Shipping Preparation finishes
Phase Revision Approval must finish before Production Release starts

Dependency Fields#

The Dependencies section may include:
Predecessor
Dependency Type
Lag or Lead
Add button
Existing dependency list

Predecessor#

The Predecessor is the task that controls the timing relationship.
Example:
Current Task:
Create Purchase Request
Predecessor:
Estimate Materials
This means the timing of Create Purchase Request is linked to Estimate Materials.

Dependency Types#

Available dependency types include:
FS: Finish to Start
SS: Start to Start
FF: Finish to Finish
SF: Start to Finish

FS: Finish to Start#

The current task starts after the predecessor finishes.
Example:
Estimate Materials starts after Prepare GA Drawings finishes.
This is the most common dependency type.
Use it for sequential activities where one task must be completed before the next task can begin.

SS: Start to Start#

The current task starts when the predecessor starts.
Example:
Prepare Procurement Plan starts when Material Estimation starts.
Use this dependency when two activities can begin at the same time.

FF: Finish to Finish#

The current task finishes when the predecessor finishes.
Example:
QC Documentation finishes with Final Inspection.
Use this dependency when two activities must be completed together.

SF: Start to Finish#

The current task finishes when the predecessor starts.
This dependency type is less common.
It may be used for special handover or shift-transition workflows where the completion of one task depends on the start of another.
Use SF dependencies only when the operational relationship is clear.

Lag and Lead#

The Lag / Lead value adjusts the timing between dependent tasks.
Positive value = Lag
Negative value = Lead
Zero = No additional delay or overlap

Lag Example#

Dependency Type: Finish to Start
Lag: 2 days
Meaning:
The current task begins two days after the predecessor finishes.
Example:
Predecessor: Approve Revision
Current Task: Release Phase for Production
Lag: 1 working day
The production release task begins one working day after approval.

Lead Example#

Dependency Type: Finish to Start
Lead: -1 day
Meaning:
The current task can begin one day before the predecessor finishes.
Lead creates an overlap between tasks.
Use lead only when:
The overlap is operationally safe
The current task does not require the predecessor to be fully complete
The responsible teams understand the relationship
Partial predecessor output is sufficient

Reviewing a Template Before Saving#

Before saving a Task Template, confirm:
The Template Name is clear
The Description explains when to use it
Applies to is correct
The correct Offset Unit is selected
All required tasks are included
Task names are action-based
Assignees are appropriate
Watchers have been added where needed
Tags are consistent
Priorities are realistic
Start Offsets are correct
Durations are realistic
Estimated Hours are reasonable
Dependencies represent real operational relationships
Subtasks are positioned under the correct parent task
The Timeline View displays the intended sequence
After completing the review, click Save.

Applying a Task Template#

After creating a template, users can apply it from the Task Templates page.
image.png
To apply a template:
1.
Navigate to Task Manager → Task Templates
2.
Find the required template
3.
Click Apply
4.
Select the target Project, Building, or Phase
5.
Select the Start Date
6.
Review the Schedule Preview
7.
Click Apply
Fabritec then creates the tasks automatically.

Apply Task Template Window#

The Apply task template window displays the template information before tasks are generated.
The window may include:
Template Name
Description
Number of tasks
Applies to
Offset Unit
Target selector
Start Date
Schedule Preview
Apply button
Cancel button
Review this information carefully before creating the tasks.

Selecting the Target#

The target selector depends on the template’s Applies to setting.
Project template → Select a Project
Building template → Select a Building
Phase template → Select a Phase
This ensures the generated tasks are linked to the correct operational entity.
For example:
A Project Kickoff template should be applied to the relevant Project
A Building Preparation template should be applied to the relevant Building
A Phase Revision template should be applied to the relevant Phase

Start Date#

The Start Date is the date Fabritec uses to calculate the generated task dates.
Fabritec combines:
The selected Start Date
Each task’s Start Offset
Each task’s Duration
The selected Offset Unit
Any configured dependencies
Example:
Start Date: June 20
TaskStart OffsetGenerated Start Date
Review Contract0June 20
Upload Documents1June 21
Prepare Drawings2June 22
If the template uses Working Days, non-working days are excluded.
If the template uses Calendar Days, all days are included.

Schedule Preview#

Before the tasks are created, Fabritec displays a Schedule Preview.
The preview can be shown using:
Days
Dates

Days#

The Days view displays each task according to its position inside the template.
Example:
Day 0
Day 1
Day 2
Day 5
This is useful for reviewing the template’s relative schedule.

Dates#

The Dates view displays the actual generated dates based on the selected Start Date.
This is useful for confirming:
Start Dates
Due Dates
Working-day calculations
Weekend handling
Task overlap
Overall schedule span
Always review the Schedule Preview before clicking Apply.
After the tasks are created, changing the template does not automatically rebuild the already-generated tasks.

What Happens After Applying the Template?#

After clicking Apply, Fabritec creates real tasks inside Task Manager.
The generated tasks can include:
Status
Priority
Assignees
Watchers
Tags
Start Date
Due Date
Description
Estimated Hours
Comments
Attachments
Work Logs
Audit Logs
Dependencies
Entity linking
Notifications
Archive controls
The tasks can then be managed using the standard Task Manager features.
Task Templates do not create static checklists.
They create live operational tasks that can be assigned, updated, discussed, monitored, and completed.

Practical Example: New Project Kickoff Template#

Template Name#

New Project Kickoff

Description#

Use this template when creating a new Project to review the commercial scope, collect documentation, assign the Project team, and begin engineering and planning activities.

Applies To#

Project

Offset Unit#

Working Days

Tasks#

TaskAssigneeStart OffsetDurationPriority
Review ContractProject Manager01High
Upload Project DocumentsDocument Controller02Normal
Assign Project TeamProject Manager11High
Prepare GA DrawingsDesign Engineer25High
Estimate MaterialsPlanning Engineer72Normal
Create Purchase RequestProcurement Engineer91Normal

Dependencies#

Estimate Materials depends on Prepare GA Drawings
Create Purchase Request depends on Estimate Materials

Result#

When the template is applied, Fabritec creates the kickoff tasks with:
Planned dates
Assignees
Priorities
Durations
Dependencies
Project linking
The Project team can begin execution without rebuilding the workflow manually.

Practical Example: Phase Revision Workflow#

Template Name#

Phase Revision Workflow

Description#

Use this template when preparing a new Phase revision, from revision creation and item import through approval and production release.

Applies To#

Phase

Offset Unit#

Working Days

Tasks#

TaskAssigneeStart OffsetDurationPriority
Create RevisionPlanning Engineer01High
Import Phase ItemsPlanning Engineer01High
Upload Phase DrawingsDocument Controller12High
Review Imported ItemsPlanning Manager21Normal
Approve RevisionProject Manager31High
Release Phase for ProductionProduction Manager41Critical

Dependencies#

Upload Phase Drawings depends on Import Phase Items
Review Imported Items depends on Upload Phase Drawings
Approve Revision depends on Review Imported Items
Release Phase for Production depends on Approve Revision

Result#

The Phase team receives a complete workflow for:
Preparing the revision
Reviewing imported data
Controlling approval
Releasing the correct Phase information to production

Practical Example: Building Preparation Workflow#

Template Name#

Building Preparation Workflow

Applies To#

Building

Offset Unit#

Working Days

Tasks#

TaskAssigneeStart OffsetDurationPriority
Review Building ModelDesign Engineer02High
Confirm Building QuantitiesPlanning Engineer21High
Extract Building BOMPlanning Engineer32Normal
Prepare Phase BreakdownProject Manager52High
Review Shipping SequenceShipping Coordinator71Normal
Confirm Site RequirementsProject Manager81Normal

Result#

The selected Building receives a controlled preparation workflow covering engineering, planning, and shipping coordination.

Common Use Cases#

New Project Kickoff#

Use a Project template when a new Project begins.
Typical tasks:
Review Contract
Upload Project Documents
Confirm Scope of Work
Assign Project Team
Prepare Project Schedule
Prepare Initial Drawings

Project Document Collection#

Use a Project template to collect the documents required before engineering or planning begins.
Typical tasks:
Upload Contract
Upload BOQ
Upload Drawings
Upload Specifications
Review Customer Documents
Confirm Missing Information

Building Preparation#

Use a Building template when each Building requires its own preparation process.
Typical tasks:
Review Building Model
Extract Building BOM
Confirm Building Quantities
Prepare Phase Plan
Review Shipping Sequence
Confirm Site Requirements

Phase Revision Preparation#

Use a Phase template when preparing a new revision.
Typical tasks:
Create Revision
Import Items
Upload Drawings
Upload Supporting Files
Review Quantities
Approve Revision

Production Release Checklist#

Use a Phase template before releasing work to production.
Typical tasks:
Confirm Revision Approval
Validate BOM
Confirm Latest Drawings
Review Quality Requirements
Confirm Routing
Confirm Production Readiness
Release Phase for Production

Quality Control Follow-Up#

Use a Phase template when Quality Control activities require structured follow-up.
Typical tasks:
Confirm Inspection Requirements
Review Pending Inspections
Complete Dimensional Inspection
Review Welding Inspection
Record Rework
Confirm Final Approval

Shipping Readiness#

Use a Project or Phase template to prepare work for dispatch.
Typical tasks:
Review Completed Items
Confirm Quality Approval
Prepare Packing List
Confirm Loading Requirements
Review Shipping Sequence
Coordinate Dispatch Date

Template Governance#

Task Templates support stronger task-management governance by providing a consistent structure for repeated work.

Reusable Execution Structures#

Templates ensure that teams follow the same workflow each time the same operational process occurs.

Entity-Based Planning#

Templates can be linked to:
Projects
Buildings
Phases
This keeps tasks connected to the correct operational context.

Standard Responsibility#

Templates can define assignees and watchers in advance.
This reduces uncertainty about who is responsible for each activity.

Consistent Scheduling#

Start Offsets, Durations, and Offset Units create a repeatable scheduling method.

Controlled Dependencies#

Dependencies maintain the planned sequence between related tasks.

Reduced Manual Setup#

Users do not need to recreate repeated tasks, assignments, priorities, and dates manually.
This supports:
Consistent task creation
Clearer responsibility
Faster workflow setup
Stronger execution control
Better coordination
Reduced missed activities

Important Considerations#

Confirm that the template Applies to the correct entity type before saving it.
Review user assignments regularly when team responsibilities change.
Do not add dependencies unless a real timing relationship exists.
Use Working Days for internal execution workflows when company calendars must be respected.
Use Calendar Days for commitments that continue across weekends or non-working days.
Review generated dates before applying the template.
Avoid creating very large templates when the workflow can be divided into smaller, focused templates.
Update templates when the organization’s standard operating process changes.
Changes to a template affect future applications, not tasks that were already generated.

⭐ Best Practices#

Use clear and specific template names
Write descriptions that explain when the template should be used
Select Applies to carefully
Use Project templates for project-wide workflows
Use Building templates for building-specific activities
Use Phase templates for revision, production, QC, and shipping workflows
Use Working Days for operational execution
Use Calendar Days for fixed calendar commitments
Keep task names action-based
Use subtasks for detailed work packages
Assign responsible users from the beginning
Add watchers only when they require visibility
Use tags for classification
Set realistic priorities
Define realistic Start Offsets and Durations
Add Estimated Hours where workload planning is important
Use dependencies only when tasks have a real sequence
Review Timeline View before saving
Review Schedule Preview before applying
Update templates when the standard workflow changes
Archive or stop using duplicate and outdated templates

🔗 Related Articles#

Reports – Analyze production performance
Dashboards – Track daily productivity trends
Shifts – Manage worker schedules
Labours – Assign and manage factory workers