Fabritec Docs
English
  • English
  • Arabic
Learning Center
Support CenterChangelog
Learning Center
Support CenterChangelog
English
  • English
  • Arabic
English
  • English
  • Arabic
  1. Production Execution
  • Getting Started
    • Introductions
    • Installing Fabritec as a Desktop or Mobile App
    • User Profile & Change Language
    • Notification Settings and Push Notifications
    • Home
  • Administration & Setup
    • Company Setup
      • Company Profile
      • Preferences
      • License Info
      • Settings
    • Users & Permissions
      • Roles
      • Departments
      • Users
      • Logs
    • Production Setup
      • Production Stages
      • WorkStations
      • Categories
      • Routes
      • Labour Titles
      • Shifts
      • Labours
      • Labour Group
  • CRM
    • Introduction to CRM
    • Forecast Dashboard
    • CRM Pipeline and Enquiry Management
    • CRM Customers
    • CRM Analytics
    • CRM Settings
  • Projects
    • Customer & Project Basics
      • Customers
      • Create New Project
      • Overview
      • Details
      • Buildings
    • Documents & Communication
      • Folder Structure
      • Documents
      • Messages
    • Phases, Items & Revisions
      • Phases
      • Phases Explorer
      • Phases Explorer: Manual Item Entry, Drawing Validation, and Smart Allocation
      • Revisions: Bulk Paint Update & Selective Item Deletion
    • Routing & Production
      • Routing Setup
      • Tracking
    • Project Quality Control
      • Quality Control
    • Project Shipping
      • Shipping Status
      • Shipping
    • Site Completion
      • Erection
  • Production Execution
    • Production
    • Production Access
    • Production Logs
    • Revert & Refabricate Items in Production
  • Tasks Managment
    • Task Manager
    • Task Templates
    • Task Schedule View
  • Quality Control
    • Inspections
    • Quality Control Access
  • Shipping & Delivery
    • Shipping Yard
    • Shipping Calendar
  • Insights, Reports & AI
    • Dashboards
    • Reports
    • Connecting Fabritec with AI Assistants: Claude AI and ChatGPT
  • Fabritec Workflow
    • Fabritec Project Lifecycle workflow
    • Fabritec Dashboards and Reports workflow
    • Production Setup & User Management Workflow
  1. Production Execution

Production Logs

The Production Logs page provides a traceable history of production activities recorded in Fabritec.
image.png
Each log represents a production execution submitted against a specific:
Project phase
Item or mark
Production stage
Quantity
Workstation
Labour assignment
Operation date
Duration
When Quality Control is required, the same record also shows the related inspection result, accepted quantity, and rework information.
Production Logs allow production managers, supervisors, quality teams, and authorized administrators to confirm:
What work was recorded
Which item and stage were updated
Who submitted the update
Which workers performed the operation
Which workstation was used
How much quantity was processed
Whether inspection was required
How much quantity was accepted
Whether rework was recorded
Unlike the Items and My Production tabs, which focus on current and actionable production work, the Logs tab focuses on historical execution records.

Where to Find Production Logs#

Navigate to:
Production → Logs
The page displays production records from across the factory, subject to the logged-in user’s permissions.

What Creates a Production Log?#

A Production Log is created when an authorized user records a production operation against an item.
For example, a user may submit that:
48 units of mark S6
Completed the Bending stage
At the Angle Bending Machine
Using three assigned labour records
With an operation duration of one hour
Fabritec stores this submission as a Production Log.
If the stage requires Quality Control, the recorded quantity is connected to an inspection workflow. After the inspection is completed, the Production Log displays the inspection outcome and accepted or rework quantities.

Production Logs and Item Progress#

Production Logs are directly connected to item progress.
When a production update is submitted, Fabritec uses the recorded quantity and the item’s configured route to update the item’s stage-level quantities.
Depending on the route and Quality Control requirements, the quantity may become:
Completed at the current stage
Waiting for inspection
Accepted and available for the next stage
Returned for rework
Partially accepted and partially returned for rework
Production Logs should therefore be treated as operational records, not only as informational notes.
Changing a log can affect how production history is interpreted. Corrections should be made only by authorized users and only when the recorded information is incorrect.

Required Permissions#

Access to Production Logs is controlled through role permissions.
Permissions are managed from:
User Management → Roles
The relevant permissions normally include:
View Production Logs
Modify Production Logs
A user with viewing permission may review and filter production records.
A user also requires modification permission to edit available log information.
The actions displayed in the Actions column may differ according to the user’s permissions and the state of the production record.

Production Logs Page Overview#

The Logs page contains:
Export tools
Refresh and cache controls
Search
Column selection
Column-level filters
A scrollable production log table
Pagination controls
Row-level actions
Because the table contains execution, labour, quality, and rework information, use the horizontal scrollbar to review columns that are not visible in the initial view.

Page Tools#

Excel Export#

Click Excel Export to download the displayed Production Logs in Excel format.
Use the Excel export when you need to:
Perform an authorized offline review
Prepare an internal audit file
Compare production quantities across stages
Review labour or workstation usage
Share filtered production information outside Fabritec
Apply the required filters before exporting when you need a focused report.

PDF Export#

Click PDF Export to create a PDF report from the Production Logs table.
PDF exports are useful for:
Formal production reviews
Management reporting
Audit documentation
Period-based operational summaries

Refresh#

Click Refresh to reload the Logs table and retrieve recent production changes while keeping the current page context.
Use Refresh after:
A new production update is submitted
A Quality Control inspection is completed
A log is corrected
A rework result is recorded

Clear Filter#

Click Clear filter to remove applied column filters.
This returns the table to its broader unfiltered view.
When text remains in the main Search field, clear the search text separately if required.

Search#

Use the Search field to locate records using visible production information.
Search can help locate records related to:
A phase
A mark
A production stage
A user
A workstation
A labour name
For more precise results, combine Search with the filters available in individual column headers.

Columns#

Click Columns to control which columns are shown in the table.
This is useful when reviewing a specific part of the production record.
For example:
A production supervisor may focus on stage, quantity, workstation, duration, and labour.
A quality manager may focus on inspection, inspected by, accepted quantity, and rework.
Management may focus on phase, mark, quantity, total weight, and operation date.
Hiding a column does not delete its data. It only changes the current table view.

Reset Cache#

Click Reset cache when recent updates do not appear after using Refresh.
Reset Cache forces the table to rebuild its displayed production data from the latest available records.
Use this option when:
A recently submitted log does not appear
A Quality Control result has changed but the table still shows an earlier value
A corrected labour or workstation assignment is not displayed
The table appears out of sync with the item details
Reset Cache does not delete production records.

Production Logs Table#

Each row represents one recorded production operation.
The available columns may vary according to the selected column configuration.

Identification and Timing Columns#

ColumnDescription
PhaseThe project phase containing the production item
MarkThe item or component identifier associated with the log
Log DateThe date on which the production log was recorded in Fabritec
Operation TimeThe production date or operation time entered for the activity
StageThe production stage against which the activity was submitted
Created ByThe Fabritec user who created the production log

Log Date and Operation Time#

These fields serve different purposes.
Log Date identifies when the record was created or entered in Fabritec.
Operation Time identifies when the production activity was performed or recorded as having occurred.
The values may be the same when users submit production immediately after completing the work.
They may differ when production activity is entered later.
For accurate reporting, users should record the correct operational date rather than automatically using the date of data entry.

Production Execution Columns#

ColumnDescription
QtyThe quantity recorded in the production operation
Rework QuantityThe quantity associated with rework, when applicable
Work StationThe machine, production area, line, or station used for the operation
DurationThe recorded operation duration
LaboursThe workers assigned to the production activity
Total Weight (t)The total weight represented by the logged quantity, displayed in tonnes when item weight data is available

Quantity#

The Qty column shows the quantity processed in that production submission.
A log does not always represent the full item quantity.
For example, an item with a total quantity of 100 may be processed through multiple logs:
First log: 40 units
Second log: 35 units
Third log: 25 units
Together, these logs account for the full item quantity.
This allows Fabritec to support partial production and staged execution.

Work Station#

The Work Station column identifies where the operation was performed.
Examples may include:
Angle Bending Machine
CNC Plasma Cutting Machine
Welding Station 01
Assembly Area
Painting Booth
Workstations are configured under Production Setup.
Correct workstation information supports:
Capacity analysis
Machine utilization reviews
Bottleneck investigation
Production traceability

Duration#

The Duration column records the time assigned to the production activity.
The value is displayed in a time format such as:
01:00:00
This represents one hour.
Duration supports operational analysis such as:
Comparing actual execution time across items
Reviewing workstation productivity
Monitoring labour use
Identifying unusually long operations
Duration should reflect the time recorded for the operation according to your organization’s production process.

Labours#

The Labours column lists the workers assigned to the production operation.
Each labour entry may display:
Labour code
Labour name
For example:
542 – Ibrahim Mohamed
879 – Mohamed Ahmed
234 – Ahmed Omar
The labour records identify who performed the work.
They are different from Created By, which identifies the Fabritec user who submitted the production update.
A supervisor may create a log on behalf of several workers. In this case:
Created By shows the supervisor’s user account.
Labours shows the workers who performed the activity.

Quality Control Columns#

When a production stage requires Quality Control, the Logs table displays information from the linked inspection.
ColumnDescription
InspectionThe current inspection status or outcome
Inspected byThe user who completed the inspection
AcceptedThe quantity accepted through Quality Control
ReworkIndicates whether rework was recorded
Rework ReasonDisplays the recorded rework explanation when applicable

Inspection#

The Inspection column displays the quality state connected to the production log.
For example:
Approved
An Approved result indicates that the Quality Control process has accepted the inspected quantity.
When a production stage does not require Quality Control, the inspection-related fields may be empty or may display a non-inspection state, depending on the workflow configuration.

Accepted#

The Accepted column shows the quantity accepted by Quality Control.
For example:
Production quantity: 48
Accepted quantity: 48
Rework: No
This means the full logged quantity passed inspection.
If only part of the submitted quantity is accepted, the accepted value may be lower than the original production quantity.
The remaining quantity may require rework or additional quality action.

Rework#

The Rework column indicates whether the production record has a rework outcome.
Examples include:
No — no rework was recorded
Yes — some or all of the quantity requires rework
The related rework quantity and reason provide additional information when rework exists.

Filtering Production Logs#

Each supported column includes a filter icon.
Use filters to narrow the records according to the review you are performing.
Common filtering scenarios include:
Production completed within a specific date range
Logs for one project phase
Logs for a specific mark
Activity at one production stage
Records submitted by one user
Operations performed at one workstation
Logs involving specific labour
Approved inspections
Logs containing rework

Reviewing Logs by Phase#

Filter by Phase when reviewing the production history of a particular project phase.
This helps project and production managers understand:
Which items were processed
Which stages were completed
How much quantity was recorded
Whether inspection results are complete
Whether rework exists

Reviewing Logs by Stage#

Filter by Stage to review activity for one production process.
For example, filtering by Bending can help identify:
Bending quantities completed
Workstations used
Workers assigned
Recorded durations
Inspection outcomes
Rework related to bending operations

Reviewing Logs by Workstation#

Filter by Work Station to investigate machine or production-area activity.
This is useful for:
Workstation utilization analysis
Production issue investigation
Comparing output across machines
Identifying repeated rework linked to one station

Reviewing Logs by User#

Filter by Created By to review records submitted by a specific Fabritec user.
Remember that the user who created the record may not be the same as the workers listed under Labours.

Row Actions#

The current Production Logs table provides two primary actions:
Edit
View
The available actions depend on the user’s role permissions and the state of the record.

Viewing the Related Item#

Click the View icon to open the related Item Details page.
Item Details provides the wider context behind the selected Production Log.
The page includes:
Item name or mark
Phase
Total item quantity
Operation type
Production percentage
Quantity in production
Outsourced quantity
Quantity in the shipping yard
Shipped quantity
Stage-level progress
Inspection history

Stage-Level Progress#

The Item Details page displays the item’s route and the current quantity position at each stage.
The stage table can include:
ColumnDescription
OrderThe sequence of the stage in the production route
Stage NameThe configured production stage
Quantity AvailableQuantity currently available to be processed at the stage
Quantity Under InspectionQuantity waiting for a Quality Control result
Rework QuantityQuantity returned for rework
Quantity DoneQuantity completed at the stage
Require QCIndicates whether the stage requires Quality Control
Use this table to understand how the selected log affected the item’s current production state.

Inspection History#

The Inspections section displays the Quality Control records linked to the item.
The table can include:
Status
Inspection quantity
Quantity approved
Mark
Stage
Sent by
Sent date
Response date
Inspected by
Click the View icon in the inspection row when you need to review the inspection details.
This connection between Production Logs and Inspections provides traceability from production submission to quality approval.

Important#

The Revert, Refabricate, and Hold buttons available on the Item Details page are item-level workflow actions.
They are not the same as editing a Production Log.
Use these actions only according to the relevant operational procedure and user permissions.

Editing a Production Log#

Click the Edit icon in the Actions column to correct available production information.
Depending on the current product configuration and permissions, editable information may include:
Work Station
Assigned Labours
Operation date or production date
The edit action is intended for correcting incorrect operational information.
Examples include:
The wrong workstation was selected
One assigned worker was omitted
The production activity was recorded with the wrong date

Information That Should Not Be Casually Changed#

The following values are connected directly to production progress and Quality Control and should not be treated as simple administrative fields:
Stage
Production quantity
Accepted quantity
Rework quantity
Inspection result
Inspected by
Quality response dates
These values may be protected or governed by the related production and Quality Control workflows.
When a correction affects quantity, stage progression, inspection, or rework, review the related item and quality records before making any change.

Editing Logs with an Inspection Result#

The Edit icon may remain visible for records that already have an inspection result.
This does not mean that all parts of the record can be changed.
Operational metadata such as the workstation, labour assignment, or production date may remain editable where permitted, while inspection-related information remains controlled through Quality Control.
Do not modify an approved production record in a way that makes its production and inspection histories inconsistent.

Production Logs and Quality Control#

Production Logs and Quality Control work together when a stage requires inspection.
A typical workflow is:
1.
A production user records quantity at a stage.
2.
Fabritec creates a Production Log.
3.
The quantity is sent to Quality Control.
4.
The item shows the quantity under inspection.
5.
A quality user reviews the quantity.
6.
The inspection is approved or rework is recorded.
7.
The Production Log is updated with the inspection result.
8.
Accepted quantity is reflected in the item’s stage progress.
9.
Rework quantity is returned to the appropriate workflow when required.
This connection protects traceability between:
What production submitted
What Quality Control inspected
What was accepted
What required rework

Complete Production Log Example#

A factory processes structural steel components for phase:
EG-2391-01-01
The production team completes the Bending operation for mark:
S6
The production update contains:
FieldRecorded Value
PhaseEG-2391-01-01
MarkS6
StageBending
Qty48
Work StationAngle Bending Machine
Duration01:00:00
Created Bymanar.saeed
LaboursIbrahim Mohamed, Mohamed Ahmed, Ahmed Omar
The Bending stage requires Quality Control.
After inspection, the Production Log displays:
FieldResult
InspectionApproved
Inspected bymanar.saeed
Accepted48
ReworkNo
Total Weight0.03 t

How to Interpret This Log#

The log shows that:
48 units of S6 were processed at Bending.
The operation was performed at the Angle Bending Machine.
Three workers were assigned.
One hour was recorded for the operation.
Quality Control inspected the submitted quantity.
All 48 units were accepted.
No rework was required.
The related Item Details page shows the Bending quantity as completed and includes the linked approved inspection record.

Using Logs for Operational Reviews#

Daily Production Review#

Production supervisors can use Logs to confirm:
Which stages were updated today
Which users submitted production
Which workstations were used
Which quantities were recorded
Which operations still require inspection

Quality and Rework Review#

Quality teams can use Logs to identify:
Approved production records
Records waiting for inspection
Accepted quantities
Rework quantities
Repeat rework at a specific stage or workstation

Labour Review#

Production management can review:
Workers assigned to recorded operations
Labour participation by stage
Labour involvement at specific workstations
Incorrect or missing labour assignments
Production Logs support operational review but should be interpreted together with shift, labour, and productivity settings where applicable.

Workstation Review#

Filter and export Logs by workstation to examine:
Processed quantities
Recorded duration
Assigned labour
Inspection outcomes
Rework patterns
This can help identify bottlenecks or recurring operational issues.

Project and Phase Audit#

Filter by phase and export the results to build a traceable record of:
Production dates
Stage activity
Quantities processed
Users responsible for submissions
Quality results
Accepted and rework quantities

Pagination and Large Record Sets#

Production Logs may contain thousands of records.
Use the controls at the bottom of the table to:
Move between pages
Jump to another page
Select the number of items displayed per page
Review the total number of records
Filtering before moving through the pages makes large production histories easier to review.

Common Issues and Troubleshooting#

A Recent Production Log Does Not Appear#

Confirm that:
The production update was saved successfully
The correct phase or stage filter is applied
The Search field is not hiding the record
You are reviewing the correct page
The user has permission to view the record
Then:
1.
Click Refresh.
2.
Click Clear filter if required.
3.
Use Reset cache when the record still does not appear.

The Inspection Result Is Not Updated#

Confirm that:
The inspection has been completed in Quality Control
The inspection is connected to the same item, mark, and stage
The correct Production Log is being reviewed
Click Refresh or Reset cache to retrieve the latest quality result.
Use the View action to confirm the inspection from the Item Details page.

The Accepted Quantity Is Lower Than the Logged Quantity#

This normally indicates that:
Only part of the quantity was accepted
Some quantity was returned for rework
The inspection is not yet fully completed
Review:
Inspection
Accepted
Rework
Rework Quantity
The Inspections section in Item Details

The Created By User Is Not Listed Under Labours#

This can be correct.
Created By identifies the Fabritec user who entered the production update.
Labours identifies the workers who performed the production activity.
A supervisor can submit an update for work completed by other employees.

The Workstation or Labour Is Incorrect#

Users with the required modification permission can use the Edit action to correct available operational information.
Do not change the record until the correct workstation and labour assignments have been confirmed.

The Edit Action Is Not Available#

Confirm that the user has the required permission:
Modify Production Logs
The action may also be restricted by the state of the production or quality record.
Contact an authorized production administrator when a correction is required but the action is unavailable.

A Column Is Missing#

Click Columns and confirm that the required column is enabled.
Some columns may also be outside the visible area. Use the horizontal scrollbar to review the complete table.

Exported Results Include Too Many Records#

Apply the required filters before selecting Excel Export or PDF Export.
For example, filter by:
Phase
Stage
Operation date
Created By
Work Station
Inspection result
Then export the filtered result.

Best Practices#

Record production immediately after the operation is completed.
Enter the actual operation date.
Select the correct stage, quantity, workstation, and labour.
Record partial quantities accurately.
Do not record the full item quantity when only part was processed.
Review inspection results before considering a stage fully complete.
Use Created By and Labours for their correct purposes.
Correct inaccurate workstation or labour data promptly.
Do not change approved records without understanding their Quality Control relationship.
Use filters before exporting large log sets.
Review rework by stage and workstation regularly.
Use individual user accounts rather than shared production accounts.
Preserve the connection between Production Logs, inspections, and item progress.
Production Logs provide a traceable record of manufacturing execution from the production update through Quality Control.
They allow Fabritec users to review who performed the work, where it was completed, how much was processed, how long it took, and whether the quantity was accepted or returned for rework.

🔗 Related Articles#

Reports – Analyze production performance
Dashboards – Track daily productivity trends
Shifts – Manage worker schedules
Labours – Assign and manage factory workers
Modified at 2026-07-20 18:53:10
Previous
Production Access
Next
Revert & Refabricate Items in Production
Built with