The Work Stations page allows authorized users to create, organize, and configure the machines, production areas, and labour-driven stations used throughout Fabritec.A Work Station represents the physical or operational resource where a production activity is performed.Automatic Welding Machine
Each Work Station can be connected to its:Shift-specific operator links
Productivity and scheduling records
Correct Work Station setup is important because Fabritec uses this information to calculate production capacity, operator coverage, workstation availability, machine load, utilization, maintenance downtime, and productivity.
Where to Find Work Stations#
Production Setup → Work StationsThe page displays the Work Stations available in the organization.The information and actions available depend on the logged-in user’s permissions.
What Work Stations Control#
Work Stations connect the factory’s production setup with daily operational execution.They help Fabritec determine:Which Production Stage a workstation serves
Which calendar and working days apply to the workstation
Which shifts are scheduled to run
Which operators are normally eligible to operate the workstation
How much the workstation can produce per hour
Whether the workstation is machine-driven, labour-driven, or both
How pending work should be compared with available capacity
How workstation productivity should be calculated
How maintenance downtime affects workstation availability
A Work Station should represent a real production resource that teams can schedule, operate, monitor, and report on.
Work Stations Page#
The Work Stations page contains:The grid may require horizontal scrolling to display all available columns.
Workstation Grid#
Each row represents one Work Station.The columns displayed may include:Direct Default Production Stage
The exact columns can be controlled using the Columns button.
Code#
Displays the unique workstation code.The code should remain clear and unique so users can identify the workstation in schedules, reports, production records, maintenance orders, and exports.
Name#
Displays the workstation name.Automatic Welding Machine
Use a name that shop-floor and management users can recognize immediately.Avoid using generic names such as:unless the same naming convention is already used physically in the factory.
Status#
Displays the workstation’s current stored status.Common states may include:Maintenance workflows can change the workstation status when a breakdown is reported or a maintenance order is started or completed.Workstation Setup Status and Productivity Status#
The status shown on the Production Setup page should not be confused with the live status shown in Workstation Productivity or the Andon board.Recording production progress does not directly change the stored workstation status.Workstation Productivity calculates the live operational status using information such as:A workstation may therefore display Idle in its setup record while the Productivity page shows it as Running based on current production activity.
Type#
Displays how the workstation is mainly operated.Available types may include:Machine and Labour Driven
Machine Driven#
Use this type when production depends mainly on a machine.CNC Plasma Cutting Machine
Automatic Welding Machine
Labour Driven#
Use this type when production depends mainly on manual labour or a work team.Painting Preparation Area
Machine and Labour Driven#
Use this type when production requires both a machine and assigned labour resources.Semi-automatic welding station
Press brake requiring a dedicated operator
Machine-assisted assembly station
The selected type provides operational context for workstation setup and reporting.
Effective Date#
Displays the date from which the current workstation configuration applies.The Effective Date helps Fabritec maintain time-based scheduling and capacity information without treating every configuration change as if it had always existed.For example, when a new workstation begins operating on January 1, its Effective Date should reflect that operational start date.When editing a workstation, review the Effective Date carefully before saving.
Default Production Stage#
The Default Production Stage identifies the main production activity performed by the workstation.The value helps connect the workstation with:Pending production demand
Machine-load calculations
The grid may display a source badge beside the Production Stage.
Direct Production Stage#
A Direct badge means the Production Stage was selected directly on the workstation.Workstation: Pipe Bending Machine
Default Production Stage: Bending
The Direct Default Production Stage column shows the stage entered directly on the workstation record.
Inherited Production Stage#
An Inherited badge means the workstation receives its resolved Production Stage from another production setup configuration.When a stage is inherited, the Direct Default Production Stage field may be empty.Detailed setup and inheritance rules are covered in the separate Workstation Groups article.
Work Calendar#
The Work Calendar determines when the workstation is expected to operate.Source: Shop Default (Production)
Follow Default#
Select Follow Default when the workstation should use the organization’s default production Work Calendar.This is useful when most workstations follow the same factory schedule.Changes made to the default production calendar can then apply without editing every workstation separately.
Specific Work Calendar#
Select a specific Work Calendar when the workstation follows a different operating schedule.A machine that operates only during the night shift
A workstation that operates six days per week
A subcontracted area with a separate calendar
A workstation that does not operate during a particular shift
Use a specific calendar only when the workstation’s schedule is genuinely different from the production default.
Capacities#
The Capacities column displays the configured production rates for the workstation.Weight: 2 tonnes per hour
A workstation can have more than one capacity definition.For example, a Pipe Bending Machine may be configured with:Quantity: 1 piece per hour
Length: 500 meters per hour
This allows Fabritec to review the workstation using different measurable production units.Capacity information supports:
Supported Capacity Types#
Depending on the company configuration, Capacity Types may include:Each capacity row contains:
Capacity Type#
Defines what the workstation’s output is measured in.| Capacity Type | Typical Unit |
|---|
| Quantity | pcs |
| Length | m |
| Area | m² |
| Weight | kg or t |
| Volume | m³ |
Capacity per Hour#
Defines the workstation’s expected hourly production rate.This means the configured workstation capacity is one piece per hour.This means the configured workstation capacity is 500 meters per hour.Use a realistic sustainable rate rather than the maximum theoretical machine speed.
Unit#
Displays the unit connected to the selected Capacity Type.The unit should match the way production output is recorded in Fabritec.
Linked Labours#
The Linked Labours column displays the operators who are normally connected to the workstation.Each operator may appear with:Bassem Farouk — Any Shift
Khaled Mostafa — Any Shift
When more operators are linked than can be displayed in the row, Fabritec shows an additional count such as:Open the operator-management action to review the complete list.
What Linked Operators Mean#
A linked operator is a default relationship between a labour resource and a workstation.It tells Fabritec that the person is normally eligible to operate or cover that workstation.Linked operators support:Shift-coverage resolution
Operator assignment suggestions
Capacity and coverage calculations
A default link does not necessarily mean the person operates the workstation every day.Daily staffing also depends on:The operator’s resolved shift
Day-specific workstation assignments
Shift exceptions or one-day covers
Other workstation assignments
How Fabritec Resolves Workstation Operators#
For each workstation, date, and shift, Fabritec resolves operator coverage using the following order:1.
Day-specific operator assignment
2.
Default workstation operator link
3.
Production-stage eligible labour
The most specific available source is used first.
1. Day-Specific Assignment#
A manual or automatic dated assignment is authoritative for that workstation, date, and shift.Use dated assignments when a supervisor needs to confirm exactly who will operate a workstation on a particular day.
2. Default Workstation Link#
When no dated assignment exists, Fabritec can use an eligible operator linked directly to the workstation.Resolve to the relevant shift
Not be absent or on leave
Not already be assigned elsewhere for the same period
3. Production-Stage Eligible Labour#
When no eligible direct workstation link is available, Fabritec may use labour linked to the workstation’s Production Stage.This coverage may appear as Derived in scheduling and productivity views.Derived coverage means the person was selected from the wider Production Stage labour pool rather than from a direct workstation link.
4. Unstaffed#
If no valid operator is available, the workstation shift is considered unstaffed.Unstaffed planned hours can affect:Machine-load availability
One Operator Cannot Staff Multiple Workstations at the Same Time#
Without a day-specific assignment, Fabritec distributes eligible operators across workstations so that one person does not count as staffing several machines during the same shift.When an operator is explicitly assigned to a workstation for a date and shift, they are excluded from passive coverage on other workstations for that same period.This keeps staffing and capacity calculations realistic.
Shift Scope#
Each workstation-operator link contains a Shift Scope.The Shift Scope determines when the link can be used.Available options may include:A specific configured shift
Any Shift#
Select Any Shift when the operator may operate the workstation during any shift to which they are assigned.Any Shift does not make the operator present on every shift.The operator counts only when their actual resolved shift matches the workstation shift for that date.
Specific Shift#
Select a specific shift when the operator should be linked to the workstation only during that shift.Workstation: Automatic Welding Machine
Fabritec will not use this default link for the Morning Shift.Shift-specific links are useful when:Machines have dedicated day and night operators
Operators work only during selected shifts
Supervisors need tighter default staffing control
Searching and Reviewing Workstations#
Search#
Use the Search field to find a workstation using information such as:Search works together with active grid filters.
Column Filters#
Use the filter icon in a column header to narrow the grid by that column.Filters may be applied to fields such as:
Clear Filter#
Click Clear Filter to remove active grid filters.This restores the complete list of workstations available to the user.
Columns#
Click Columns to show or hide grid columns.Use this when reviewing a particular configuration area.For example, users managing operator setup may display:
Reset Cache#
Click Reset Cache when the grid appears outdated after configuration changes.This rebuilds the grid’s cached display data.Use it when recently saved information is still not displayed correctly after reloading the page.
Excel Export#
Click Excel Export to export the workstation grid for external review or reporting.The exported information may reflect:
PDF Export#
Click PDF Export to create a PDF version of the workstation data.Review the visible columns before exporting to keep the report readable.
Adding a Work Station#
To create a new workstation:1.
Navigate to Production Setup → Work Stations.
5.
Select the Default Production Stage when required.
6.
Select a Workstation Group when applicable.
7.
Select the Work Calendar behavior.
10.
Add one or more capacity definitions.
11.
Enter a Description when required.
12.
Review the configuration.
The form contains the following fields:Fields marked with an asterisk are required.Workstation Group configuration is explained separately in the Workstation Groups article.
Code#
Enter a unique workstation code.Consistent with factory labels
Name#
Enter the operational workstation name.CNC Plasma Cutting Machine 01Use the same name used by operators, supervisors, and maintenance teams.
Default Production Stage#
Select the main Production Stage served by the workstation.Workstation: CNC Plasma Cutting Machine
Default Production Stage: Cutting
Leave the direct stage empty only when the stage should be supplied through another configured setup or when no default stage is currently required.
Workstation Group#
Select a Workstation Group when the workstation should belong to an existing group.Select None when no group should be assigned.For detailed instructions about creating groups, inherited values, and group-level behavior, refer to the separate Workstation Groups article.
Work Calendar#
Select how Fabritec should determine the workstation schedule.Available choices may include:Use Follow Default for standard production workstations.Use a specific calendar only when the workstation follows a different schedule.
Type#
Machine and Labour Driven
Choose the option that best represents how production is executed at the workstation.
Stream Type#
The Stream Type describes how work moves through the workstation.Available options may include:Single#
Use Single when work is processed as separate jobs, items, or batches.Continuous#
Use Continuous when production flows continuously through the workstation.Select the option that reflects the real production process.
Adding Capacity#
To add a capacity definition:2.
Select the Capacity Type.
3.
Enter the Capacity per Hour.
5.
Add another capacity when the workstation must be measured in more than one way.
To remove a capacity row:1.
Locate the capacity definition.
3.
Review the remaining configuration before saving.
A workstation may contain multiple capacity definitions.
Capacity Example#
For a Pipe Bending Machine:| Capacity Type | Capacity per Hour | Unit |
|---|
| Quantity | 1 | pcs |
| Length | 500 | m |
| Capacity Type | Capacity per Hour | Unit |
|---|
| Area | 120 | m² |
| Weight | 5 | t |
Use capacity units that match the production data recorded in Fabritec.
Description#
Enter additional information about the workstation.The rich-text editor supports formatting such as:The Description may include:Special operating instructions
CNC-controlled pipe bending machine used for carbon-steel pipes up to the approved diameter and wall-thickness limits.
Descriptions provide context but should not replace formal operating or safety documentation.
Editing a Work Station#
1.
Navigate to Production Setup → Work Stations.
2.
Locate the required workstation.
4.
Review the current Code and Name.
5.
Review the Effective Date.
6.
Update the Production Stage when required.
7.
Update the Work Calendar.
8.
Update the Type or Stream Type when required.
9.
Add, edit, or remove capacities.
Configuration changes can affect scheduling, productivity, and capacity calculations.Review downstream effects before saving major changes.
Editing the Effective Date#
The Effective Date determines when the edited configuration becomes applicable.Use the date on which the operational change actually begins.A workstation moves to a new Production Stage
A new Work Calendar begins
A machine capacity changes after an upgrade
A workstation begins operating for the first time
Avoid using an earlier date unless the configuration should apply to historical scheduling periods.
Managing Workstation Operators#
To manage the default operators linked to a workstation:1.
Navigate to Production Setup → Work Stations.
2.
Locate the required workstation.
3.
Click the Manage Operators action.
4.
Select one or more operators.
5.
Review each operator’s details.
6.
Select the Shift Scope for each link.
7.
Remove any operator who should no longer be linked.
Managing workstation operator links normally requires the appropriate shift-management permission.
Manage Workstation Operators Window#
Labour Group or Department
This information helps supervisors confirm that the correct labour resources are being connected.
Operator Selection#
Use the Operators field to select one or more labour resources.The selected values may display information such as:After selection, each operator appears as a separate row.
Name#
Displays the labour resource’s name.
Code#
Displays the labour code.The code helps distinguish users who have similar names.
Job Title#
Displays the configured Labour Title.The Job Title helps supervisors review whether the person is operationally suitable for the workstation.Fabritec does not automatically treat the Job Title as a formal skills or certification check unless such controls are configured separately.
Labour Group or Department#
Displays the operator’s Labour Group or Department when available.This supports team and organizational review.A dash means no value is currently assigned.
Crew#
Displays the operator’s Crew when available.Crew information helps supervisors understand the person’s normal shift or team context.A dash means the person is not currently assigned to a Crew.
Shift Scope#
Review this value for every operator before saving.
Removing a Linked Operator#
To remove a default link:3.
Review the remaining operators.
Removing a default link does not delete historical production activity performed by that operator.It removes the person from the workstation’s future default operator pool.Existing day-specific assignments may need to be reviewed separately.
Opening Workstation Productivity#
Click Workstation Productivity to open the workstation performance overview.The Productivity area helps authorized users review:Current workstation status
Access normally requires the View Workstation Productivity permission.
Workstation Row Actions#
Depending on permissions and configuration, the Actions column may provide options to:Open workstation details or productivity
Delete or retire the workstation
Only use the Delete action when the workstation record is no longer required and its operational dependencies have been reviewed.For a temporarily unavailable machine, use the appropriate maintenance workflow instead of deleting the workstation.
How Work Station Setup Affects Fabritec#
Production#
The Default Production Stage connects the workstation with production activities and pending work.Incorrect stage configuration can cause work to appear under the wrong workstation or capacity context.
Scheduling#
The Work Calendar defines planned working time.Operator links help determine whether a planned shift is staffed.
Capacity#
Capacity definitions provide the workstation’s expected production rate and support planning and machine-load reviews.
Productivity#
Recorded production duration
to calculate workstation productivity.
Maintenance#
Breakdowns and maintenance orders can place the workstation under maintenance or mark it as broken.Maintenance downtime is deducted separately from operator coverage gaps.
Workforce#
Linked operators connect labour resources with the workstations they normally operate.Attendance, resolved shifts, leave, and day-specific assignments still determine actual coverage.
Permissions#
Relevant permissions may include:Permission to view Production Setup
Permission to create or edit Work Stations
Permission to delete or retire Work Stations
Manage Shifts for operator links and staffing assignments
View Workstation Productivity for productivity pages
Maintenance permissions for workstation maintenance details and actions
A user may be able to view workstation information without being able to change it.
Governance Rules#
Every workstation must have a unique Code.
Every workstation must have a clear Name.
Select a Type that matches the real operating method.
Select the correct Stream Type.
Configure the correct Default Production Stage.
Use Follow Default only when the workstation follows the standard production calendar.
Capacity per hour must use a valid positive value.
Capacity Units should match recorded production units.
A workstation may contain multiple capacity definitions.
Linked operators are default eligibility links, not automatic daily attendance.
Any Shift does not mean the operator is available on every shift.
An operator must be present and resolved to the shift before counting toward coverage.
A single operator must not count as staffing several workstations at the same time.
Maintenance downtime and operator coverage gaps are calculated separately.
Use maintenance workflows for temporarily broken or unavailable workstations.
Review Effective Dates before applying configuration changes.
⭐ Best Practices#
Use the same workstation Code displayed physically in the factory.
Give each workstation a clear operational Name.
Avoid duplicate records for the same machine.
Assign the correct Default Production Stage.
Keep most standard workstations on Follow Default.
Use a specific Work Calendar only when the schedule is different.
Configure realistic sustainable capacity rates.
Use capacity units that match production reporting.
Add more than one capacity only when each measure is operationally useful.
Link operators who normally operate the workstation.
Apply specific Shift Scopes when day and night teams are different.
Review linked operators when employees change roles, shifts, crews, or departments.
Use day-specific assignments for temporary staffing plans.
Keep the Description focused on useful operational context.
Review Workstation Productivity after changing calendars, capacities, or operator links.
Do not delete a workstation to represent temporary maintenance downtime.
Keep Work Station setup aligned with the real factory layout and operating process.