The Routing Setup page allows you to define and manage the full production workflow for every item inside a project phase.
This ensures that each item follows the correct sequence of manufacturing operations, machines, and processing stages.Routing is essential for:Accurate production planning
Tracking progress across manufacturing stages
Ensuring consistent workflow for all items
Connecting phases to actual factory processes
π Where to Find Routing Setup
Projects β Select Project β Routing SetupAt the top of the page, confirm:One or multiple phases are selected
Routing Setup supports multi-phase routing, meaning you can work with one or multiple phases at the same time.
π§© What You See on the Routing Setup Page#
The routing table includes:| Column | Description |
|---|
| Phase | The phase the item belongs to |
| Mark | The itemβs unique mark (Assembly or Part) |
| Type | Assembly / Part |
| Operation | The main operational group (e.g., Manufacture, Welding) |
| Route | The list of production steps assigned to the item |
| Actions | Edit or expand additional routing details |
Each item may contain multiple production steps, such as:These appear as colored tags in the Route column.
βοΈ Routing Controls#
At the top of the page, you will find several action buttons:1οΈβ£ Define Items#
Use this when routing is not assigned yet for a group of items.
This initializes default routing based on the item category and type.2οΈβ£ Edit Items#
Modify routing of selected items.Assign machines to steps (e.g., Pipe Bending Machine, Rolling Machine, Galvanizing Bath, Drying Area)
3οΈβ£ Edit Category#
Apply routing rules based on item category.
Useful when many items share identical production steps.4οΈβ£ Sync Items#
Updates routing automatically if:New items were added in a revision
Item categories were changed
Routing rules were updated
This keeps Routing Setup fully aligned with Phases Explorer.5οΈβ£ Export Options#
Excel Export β download routing data
PDF Export β generate routing sheet for workshop or supervisors
π How Routing Works#
Routing defines the production path each item must follow in the factory.For example, an item may have this routing:1.
Bending β Pipe Bending Machine
2.
Rolling β Plate Rolling Machine
3.
Galvanizing β Galvanizing Bath
Correct machine assignment
Traceability at each stage
Accurate production tracking
ποΈ Editing Routing for an Item#
Click the Edit Items button or open an item using the expand arrow.Reorder using drag-and-drop
Every update instantly affects Production and Tracking modules.
π Auto Routing (Sync Items)#
If you add new revision items, you do not need to define routing manually.The system will automatically:Apply routing based on rules
Update existing routing if needed
π§Ύ Example Routing Flow#
For mark BA1000, routing may look like:| Step | Operation | Machine |
|---|
| 1 | Bending | Pipe Bending Machine |
| 2 | Rolling | Plate Rolling Machine |
| 3 | Galvanizing | Galvanizing Bath |
| 4 | Painting | Drying Area |
Each step is displayed as a tag in the Route column.
π Best Practices#
Always complete Phase Revisions before setting routing
Use Edit Category for bulk routing changes
Sync routing after every new revision to avoid missing items
Keep machine assignments updated to reflect real workshop availability
Export routing sheets for production planning meetings