Fabritec - User-Manual
Arabic
  • English
  • Arabic
  1. Projects
Fabritec - User-Manual
Arabic
  • English
  • Arabic
  • Introductions
  • Fabritec Production Setup & User Management
    • Production Stages
      • Production Stages
      • WorkStations
      • Categories
      • Routes
      • Labour Titles
      • Shifts
      • Labours
    • User Management
      • Roles
      • Departments
      • Users
    • Settings
      • Company Profile
      • Preferences
  • General
    • Home
    • Dashboard
    • Reports
    • User Profile & Change Language
    • Projects
      • Create New Project
      • Buildings
      • Documents
      • Messages
      • Phases
      • Phases Explorer
      • Routing Setup
      • Tracking
      • Quality Control
      • Shipping Status
      • Shipping
      • Details
  • Menu
    • Folder Structure
    • Production Page
    • Quality Control
    • Shipping Yard
    • Shipping Calendar
  • FQA
    • FAQs for the Introduction Section
    • FAQs for the Production Stages
    • FAQs for the WorkStations
    • FAQs for the Categories
    • FAQs for the Routes
    • FAQs for the Labours
    • FAQs for the Roles
    • FAQs for the Departments
    • FAQs for the Users
    • FAQs for the Company Profile
    • FAQs for the Preferences
    • FAQs for the Home Page
    • FAQs for the Dashboards
    • FAQs for the Reports
    • FAQs for the Folder Structure
    • FAQs for the Create a New Project
    • FAQs for the Phases Explorer
    • FAQs for the Buildings
    • FAQs for the Production
    • FAQs for the Tracking
    • FAQs for the Quality Control (QC)
    • FAQs for the Shipping Yard
    • FAQs for the Shipping
    • FAQs for the Project Details Page
  • Fabritec Workflow
    • Production Setup & User Management Workflow
    • Fabritec Project Lifecycle workflow
    • Fabritec Dashboards and Reports workflow
  1. Projects

Quality Control

๐Ÿงช Quality Control (QC)#

The Quality Control page inside each project helps you monitor, inspect, and approve items as they progress through production stages.
This module ensures that every item meets the required standards before moving forward to the next stage or being marked as completed.

WhatsApp Image 2025-12-02 at 12.18.08 PM.jpeg#

๐Ÿ“Œ QC Overview
The QC page displays all items currently awaiting inspection or already inspected within the selected project and phase.
You can view:
Phase
Mark
Stage
QC Status (Pending / Approved / Rejected)
Quantity Sent
Quantity Accepted
Sent By
Sent Date
Inspected By
Inspection Date
This allows QC engineers and supervisors to quickly identify inspection needs and validate production readiness.

๐Ÿ“ QC Status Types#

๐ŸŸก Pending#

The item has been sent for inspection but is not yet processed by QC.

๐ŸŸข Approved#

The QC team has validated that the item meets standards and can move to the next production or shipping step.

๐Ÿ”ด Rejected#

The item did not pass inspection and must be reworked before proceeding.

๐Ÿ”ง QC Actions#

QC users can perform key actions directly from the interface:

โœ” Approve Selected#

Accepts all selected items and marks them as Approved.

โœ– Reject Selected#

Rejects all selected items and sends them back for rework.

๐Ÿ”„ Refresh#

Reloads the list to get real-time QC updates.

โœจ Clear Filter#

Resets active filters to show the full QC list again.

๐Ÿ“ค Export to Excel / PDF#

Exports the QC table for reports, audits, or documentation.

๐Ÿ” QC Workflow#

Below is the QC process inside a project:
1.
Production Team Sends Items for Inspection
Items appear in QC with Pending status.
2.
QC Engineer Reviews Items
The inspector checks the manufactured or processed items.
3.
QC Responds
If approved โ†’ item returns to production flow
If rejected โ†’ item is flagged for rework
Tracking logs are automatically updated in the system.
4.
Inspection Details Saved
Inspector name
Response timestamp
Accepted quantity
Each inspection creates a history log accessible from the Item Logs section in Tracking.

๐Ÿ‘ค QC Access (User Permissions)#

QC access is controlled through the QC Access tab inside the global Quality Control module (outside projects).
Only assigned QC users can:
Approve or reject items
View QC panels
Submit inspection responses
Admins can toggle QC Outsourcing or assign QC permissions for specific production stages.

๐Ÿ“Š Using Filters#

To help QC teams work efficiently, filters are available on every column:
You can filter by:
Phase
Mark
Stage
Status
Sent By
Inspection Date
This enables focusing on items requiring urgent inspection.

โญ Best Practices for Quality Control#

โœ” Inspect Items Promptly#

Delayed inspections hold up production and shipping.

โœ” Use Column Filters to Prioritize Work#

Filter by Pending to see only items awaiting inspection.

โœ” Always Review Quantities Carefully#

Ensure the quantity sent matches the quantity accepted.

โœ” Coordinate with Production#

Rejected items should be communicated immediately to avoid bottlenecks.

โœ” Export QC Reports Regularly#

Provides documentation for compliance, audits, and customer reports.

โœ” Ensure QC Access Permissions Are Updated#

Assign/remove QC roles when team members change.

๐Ÿ”— Related Pages#

๐Ÿ“ฆ Tracking#

Shows how QC decisions affect item progress and stage completion.

๐Ÿ”ง Routing Setup#

Determines which stages require QC before proceeding.

๐Ÿ“˜ Phases Explorer#

QC checks are triggered after items are added and revisions are released.

๐Ÿงช Global Quality Control (Program Level)#

Manages QC roles, permissions, and production stage access.

๐Ÿšข Shipping Yard#

Only QC-approved items move to shipping preparation.
Modified atย 2025-12-02 10:42:05
Previous
Tracking
Next
Shipping Status
Built with