Fabritec - User-Manual
Arabic
  • English
  • Arabic
  1. Projects
Fabritec - User-Manual
Arabic
  • English
  • Arabic
  • Introductions
  • Fabritec Production Setup & User Management
    • Production Stages
      • Production Stages
      • WorkStations
      • Categories
      • Routes
      • Labour Titles
      • Shifts
      • Labours
    • User Management
      • Roles
      • Departments
      • Users
    • Settings
      • Company Profile
      • Preferences
  • General
    • Home
    • Dashboard
    • Reports
    • User Profile & Change Language
    • Projects
      • Create New Project
      • Buildings
      • Documents
      • Messages
      • Phases
      • Phases Explorer
      • Routing Setup
      • Tracking
      • Quality Control
      • Shipping Status
      • Shipping
      • Details
  • Menu
    • Folder Structure
    • Production Page
    • Quality Control
    • Shipping Yard
    • Shipping Calendar
  • FQA
    • FAQs for the Introduction Section
    • FAQs for the Production Stages
    • FAQs for the WorkStations
    • FAQs for the Categories
    • FAQs for the Routes
    • FAQs for the Labours
    • FAQs for the Roles
    • FAQs for the Departments
    • FAQs for the Users
    • FAQs for the Company Profile
    • FAQs for the Preferences
    • FAQs for the Home Page
    • FAQs for the Dashboards
    • FAQs for the Reports
    • FAQs for the Folder Structure
    • FAQs for the Create a New Project
    • FAQs for the Phases Explorer
    • FAQs for the Buildings
    • FAQs for the Production
    • FAQs for the Tracking
    • FAQs for the Quality Control (QC)
    • FAQs for the Shipping Yard
    • FAQs for the Shipping
    • FAQs for the Project Details Page
  • Fabritec Workflow
    • Production Setup & User Management Workflow
    • Fabritec Project Lifecycle workflow
    • Fabritec Dashboards and Reports workflow
  1. Projects

Phases Explorer

🧭 Phases Explorer#

The Phases Explorer is one of the most important modules inside any project.
It allows you to:
Manage phase revisions
Upload and organize items, drawings, and files
Generate and download Bill of Materials (BOM) reports
Track the progress of each revision from creation to approval
This workspace brings all production data for a phase into one structured workflow to ensure accuracy, traceability, and smooth coordination between engineering, production, and quality teams.

WhatsApp Image 2025-12-02 at 11.44.00 AM.jpeg#

šŸ“ Where to Find Phases Explorer
Navigate to:
Projects → Select Project → Phases Explorer
At the top, you will see:
Project Selector
Phase Selector
Make sure the correct project and phase are selected before adding or editing revisions.

šŸ“‚ Tabs Inside Phases Explorer#

Phases Explorer is divided into three main tabs:

1ļøāƒ£ Revisions#

View all revisions created for this phase.

2ļøāƒ£ Final Items#

Displays all final approved items for the phase.

3ļøāƒ£ Sub Items#

Displays detailed breakdowns when items contain parts/components.

šŸ“ Revisions Tab#

The Revisions tab is the starting point for creating and managing revisions.
You will see:
Phase Name
Revision Number
Status (Add Items, Completed, Under Review, Approved)
Created By / Checked By / Approved By
Approved Date
Actions include:
āœļø Edit Revision
šŸ—‘ļø Delete Revision
šŸ‘ļø View Revision Details
You also have export options:
Excel Export
PDF Export
BOM Report

537cc99a-6294-49b3-8f1a-e11574e68f60.png#

āž• Creating a New Revision#

Click Add Revision.
793f4078-68c8-4a28-8eac-e7c766b404c6.png
A window will appear asking you to:

Step 1: Select Phase#

Choose the phase you want to add a revision to.
Click Next to begin building your revision.

šŸ”§ Revision Workflow#

Each revision consists of four steps:

1ļøāƒ£ Add Items#

This is where you upload or manually add production items.
You can:

šŸ“¤ Import Items From Excel / CSV#

Select a schema that matches the structure of your Excel file.
Upload your file.
Review the items before saving.

šŸ—ļø Create Custom Schema#

If your file format is different:
Click Add New Scheme
Define column mappings (Item Mark, Quantity, Profile, Material, etc.)
Save the scheme for future use
61a82130-172e-44e3-af7f-f0d68f33cd5d.png

šŸ“‹ After Importing#

You will see items categorized as:
New
Updated
Deleted
You can also export items in Excel or PDF.

2ļøāƒ£ Add Drawings#

Once items are loaded, link each item to its drawing.
d7f393bc-40a2-467f-9b52-e1070d2220d8.png
You will see:
Item MarkLinked FileStatusActions
Possible statuses:
🟠 No Matching Found → Drawing not yet uploaded
🟢 Matched → Drawing successfully linked
Actions include:
Link / Unlink drawing
Delete drawing reference
When done, click Upload Drawings.

3ļøāƒ£ Add Files#

This step organizes supporting documents inside a structured revision folder.
The system automatically creates:
REV00/
└── Drawings/
You can:
Upload PDFs
Upload DWG/DXF files
Add additional folders
Manage files like a document system

4ļøāƒ£ Review & Confirm Revision#

Before finalizing, preview all:
Items
Drawings
Files
Total Quantities
Total Weight
If everything is correct, click Confirm Revision.

0d24e41d-2cea-400b-832e-67fc6ba7e25a.png#

āœ”ļø Revision Approval Workflow#

Once a revision is created, its status becomes Under Review.
A reviewer (Engineering / Planning Manager) can:
Accept → Revision becomes final
Reject → Sent back for correction
166eeb5f-48de-463e-8bdf-97f5d744d7eb.png
Once accepted:
Items become available in Final Items tab
Revision is locked from further editing
Data becomes visible to Routing, Production, and QC modules

šŸ“˜ Revision Details Page#

Click any revision to open its detailed page.
Sections include:

šŸ”¹ Revision Info#

Revision number
Created by
Reviewed by
Dates
Description

šŸ”¹ Final Items Info#

Total number of items
Total weight

šŸ”¹ Items#

Complete list of final approved items.

šŸ”¹ Documents#

All files generated or uploaded for this revision.

šŸ“Š Bill of Materials (BOM) Report#

Available directly from Phases Explorer.
The BOM Report contains:
Project Information
Phase Information
Items List (marks, profiles, material, paint, length, weight)
Totals (weight, quantity)
This report is automatically generated in a clean printable PDF format.

⭐ Best Practices#

Always finalize Build Model → Buildings → Phases before starting revisions
Use Excel Import for large item entries
Create a custom schema only once, then reuse it
Upload drawings before linking to save time
Always verify revision items before confirming
Keep revision descriptions meaningful for future reference
Use BOM Report for coordination with procurement, planning, and production

šŸ”— Related Pages#

Phases – Setup phase details before revisions
Routing Setup – Define operations sequence for items
Production – View and track manufactured items
Quality Control – Inspect approved revision items
Documents – Manage project-level documents
Modified atĀ 2025-12-02 09:51:31
Previous
Phases
Next
Routing Setup
Built with